Forum quick links
Exterior lighting
NC-v4 EAp2:Minimum energy performanceposted by Santiago Sánchez Sánchez on
Hello,
I am currently working on a residential project looking for certification under LEED V4.
Bikeshare Programs
NC-v4 LTc6:Bicycle facilitiesposted by Allison Wilson on
Has anyone had experience in a LEEDv4 project using bikeshare networks as a way to reduce the number of bicycle storage spaces that must be incorporated within a project?
Heat Island credit much easier?
NC-v4 SSc5:Heat island reductionposted by Elizabeth Powers on
Is anyone else finding this combined heat island credit much easier to get than expected? Given that the thresholds were raised for non-roof paving SR, I understood that additives to lighten
Entire building vs. parts of the building within scope of work
NC-v4 EQc6:Interior lightingposted by Edgar Arevalo on
In NYC, there is building that the clients are looking to see if it complies with undergoing LEED certification under a Local Law. They pretty much ask for what could be included in the scope
Main Street Program as a Priority Designation
NC-v4 LTc3:High priority siteposted by Teresa Stern on
Our project is located 2 blocks from the nearest historic district, but is within the Downtown area encompassed by the local Main Street Program.
LEED Project Boundary on Contract Documents
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Mark Zoeteman on
Is it required in v4 BD+C to show LPB on civil and architectural contract documents? Project includes renovation and addition to an existing building.
Pilot-Credits EQpc124: Performance-based indoor air quality design and assessment
CI-v4 INc1:Innovationposted by Amanda Lehman Garvey on
Looking to pursue Tier 2, Path a.
Has anyone successfully submitted this credit? Hoping to understand what the reviewers may be looking for in terms of an occupant survey.
FSC Certified Laminated to Non-FSC Cork Material
NC-2009 MRc7:Certified Woodposted by Bobby White on
I'm just getting started working with this and am trying to find out if FSC Certified material credits can be applied if Non-FSC cork is laminated to it. - Thanks.
Automatic Receptacle Controls in 'open offices'
NC-v4 EAp2:Minimum energy performanceposted by Kavita Karmarkar on
The following process load requirement for Automatic Receptacle controls mentions 'open office'.
manual control clarification for translucent glazing
NC-v4 EQc7:Daylightposted by Elaine Bright on
The design team wants to know if translucent glazing in clerestory windows would be a manual means of complying with glare control for the daylighting credit requiement for a V4 BD+C