CS with v2009 with future tenants using CI v4 or v4.1

LEED v4.1 Discussion Forum
posted by  Bill Abballe  on 

We are working on a CS v2009 project and we are pursuing the credit SSc9 "Tenant Design and Construction Guidelines". I assume future tenant will be asked to register under the v4 or v4.1 program.

1
Mon Mar 11, 2019, 1:20 am

Building footprint for open space vs. roof area

Schools-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Yukari Treible  on 

I haven seen this same type of question in the forum before, but in this particular case it is extreme, so I would appreciate some feedback/opinions.

0

Do the showers for the Bicycle Facilities have to be included in the calculations?

NC-v4 WEp2:Indoor water use reduction
posted by  Steven Wheeler  on 

Do the showers for the Bicycle Facilities have to be included in the calculations?

1
Wed Jan 30, 2019, 12:27 am

Does the shower have to meet ADA requirements?

NC-v4 LTc6:Bicycle facilities
posted by  Steven Wheeler  on 

Does the shower have to meet ADA requirements?

 

1
Wed Jan 30, 2019, 2:17 pm

Green Squared Levels?

Pilot-Credits MRpc112:Certified Multi-attribute Products and Materials
posted by  Kristi Ennis  on 

We have found a product that is Green Squared Certified. There is no mention on the certificate of a Level 1, 2 or 3 certification.

1
Thu Jan 31, 2019, 3:45 pm

CDPH v1.2 (2017)

NC-v4 EQc2:Low emitting materials
posted by  Kristen Magnuson  on 

Does the USGBC accept products that have been tested for emissions in accordance with CDPH v1.2 (2017) for compliance with the low-emitting materials credit?

7
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Mon Jan 28, 2019, 4:13 pm

Dwelling Units/Residential definition for ventilation

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Larry Jones  on 

Can anyone provide me with a definition or point me towards how LEED v4 defines a dwelling unit? I have a dormitory project and am trying to interpret the Resi Only requirements for v4.

4
SW Regional Design Resilience Leader
Gensler
LEEDuser Basic Member
15 thumbs up
Thu Jan 24, 2019, 1:06 am

Previous Renovation Work in a Project

EBOM-v4 MRc5:Solid waste management - facility maintenance and renovations
posted by  Craig Sheehy  on 

Hello,

I wanted to know if we can use the previous renovation work data for this credit. Does the renovation has to take place during the performance period?

1
Tue Feb 5, 2019, 2:04 am

P-Patch as Non-Adjacent Open Space for Municipal Owner

NC-v4 SSc3:Open space
posted by  Teresa Stern  on 

We have a municipal building that won't likely comply with the open space area needed based on the project site area alone. However there is a City-owned P-Patch nearby.

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Wed Jan 23, 2019, 8:21 pm

Additions to Existing Cold Storage Facility

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Dustin Norton  on 

I am working on a project that includes a large existing cold storage facility that will essentially double in size after renovations.

2
Sustainability Program Manager
Primus Design Services, LLC
LEEDuser Premium Member
40 thumbs up
Wed Jan 23, 2019, 7:49 pm