Forum quick links
25ft of entrace located near corner of building
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Mary Grace Wong on
Does the 25ft referring to a straight line measurement? Or, it's following the building footprint?
Fraction use of FSC materials
NC-2009 MRc7:Certified woodposted by Lilian Seow on
This question and answer come from above and Missing Manual: A product has FSC-certified veneer, but a non-certified core. Can we prorate the MRc7 contribution of this product based on the cost of
Inconsistency between BD+C and O+M
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Adam Stoker on
Despite efforts to better align the rating systems in LEED v4, there are some inconsistencies between the Enhanced Indoor Air Quality Strategies credits in BD+C and O+M.
Primer for Waterproofing membrane
NC-v4 EQc2:Low-emitting materialsposted by Leanne Conrad on
In the requirements for this credit, the building exterior is defined as "everything outside and inclusive of the primary and secondary weatherproofing system, such as waterproofing membranes and a
Workstation Components and C2C Certification
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Ashley Hu on
Hi there! Some Cradle to Cradle (C2C) certifications notes exclusions.
WELL Building Standard query for Images
posted by Nirwair Singh Bajwa on
Hi LEEDuser, My name is Nirwair (Student, University of Alberta) and I am looking at a WELL feasibility for one project. Thanks for my inquiries before and I appreciate prompt replies.
FAR for parks with pavillion
NC-v4 SSc3:Open spaceposted by nancy picard on
I would like to know if there have ever been special considerations for the FAR calculation, like when considering a municipal pavilion with a park for example?
Heated Bus Storage
NC-v4 EAc2:Optimize energy performanceposted by Victoria Watson on
Hi, I am trying to work out the best way to model a heated (cold climate) bus storage facility in the baseline.
Lease requirements for this credit
CS-2009 IEQc2:Increased ventilationposted by Troy Glasner on
Hi, I am just wondering what specific lease requirement language would be needed for this credit.
Projects with little landscaped area (prescriptive only?)
Homes-v4 WEc1:Total water useposted by Tim Nabholz on
It seems that for projects with small amounts of landscape areas, which many Homes: Midrise projects would be, the performance path doesn't seem to make sense.