Forum quick links
ERV serving 3 different tenants
CS-2009 IEQc1:Outdoor air delivery monitoringposted by Kristopher Lashley on
We have a project where the building is three separate retail tenants all being served by a single ERV that is supplying 100% of the space outdoor air.
Credit requirement language
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Ben Campbell on
Has anyone else experienced that the pilot credit requirement language is vague in spots?
SSc6.1 Design Storm Interval
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Curtis Dorosh on
Hi, I have noticed this question 2 times in the comments, but, I don't see an answer.
Number of Products
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Ashley Hu on
Hello there, For option 1, how many products would a workstation, with a privacy screen and storage attached be considered?
Functional Entry for Addition Project
NC-v4 LTc5:Access to quality transitposted by Eric White on
Our project is a four storey addition to an existing four storey building.
Trying to get EQc1 without installing a visible alarm
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Ira Ben-Reuven on
We are working to certify a NC. The tenants will not allow us to install a alarm in the presence of the customer.
Composting
EBOM-v4 MRc4:Solid waste management - ongoingposted by Claire Bannister on
Are existing buildings that are not schools still able to get a points for composting food waste? Can it be included in the calculations of ongoing solid waste?
FAR for parks with pavillion
NC-v4 SSc3:Open spaceposted by nancy picard on
I would like to know if there have ever been special considerations for the FAR calculation, like when considering a municipal pavilion with a park for example?
Heated Bus Storage
NC-v4 EAc2:Optimize energy performanceposted by Victoria Watson on
Hi, I am trying to work out the best way to model a heated (cold climate) bus storage facility in the baseline.
Lease requirements for this credit
CS-2009 IEQc2:Increased ventilationposted by Troy Glasner on
Hi, I am just wondering what specific lease requirement language would be needed for this credit.