Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

ERV serving 3 different tenants

CS-2009 IEQc1:Outdoor air delivery monitoring
posted by  Kristopher Lashley  on 

We have a project where the building is three separate retail tenants all being served by a single ERV that is supplying 100% of the space outdoor air.

1
Mon Jan 23, 2017, 3:10 pm

Credit requirement language

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Ben Campbell  on 

Has anyone else experienced that the pilot credit requirement language is vague in spots?

0

SSc6.1 Design Storm Interval

NC-2009 SSc6.1:Stormwater design - quantity control
posted by  Curtis Dorosh  on 

Hi, I have noticed this question 2 times in the comments, but, I don't see an answer.

1
Thu Aug 18, 2016, 3:32 pm

Number of Products

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Ashley Hu  on 

Hello there, For option 1, how many products would a workstation, with a privacy screen and storage attached be considered?

1
Tue Jun 13, 2017, 2:11 pm

Functional Entry for Addition Project

NC-v4 LTc5:Access to quality transit
posted by  Eric White  on 

Our project is a four storey addition to an existing four storey building.

1
Tue Aug 30, 2016, 11:26 pm

Trying to get EQc1 without installing a visible alarm

NC-2009 IEQc1:Outdoor air delivery monitoring
posted by  Ira Ben-Reuven  on 

We are working to certify a NC. The tenants will not allow us to install a alarm in the presence of the customer.

1
Tue Dec 13, 2016, 4:42 pm

Composting

EBOM-v4 MRc4:Solid waste management - ongoing
posted by  Claire Bannister  on 

Are existing buildings that are not schools still able to get a points for composting food waste? Can it be included in the calculations of ongoing solid waste?

1
Thu Jul 6, 2017, 6:44 pm

FAR for parks with pavillion

NC-v4 SSc3:Open space
posted by  nancy picard  on 

I would like to know if there have ever been special considerations for the FAR calculation, like when considering a municipal pavilion with a park for example?

3
Thu Aug 31, 2017, 2:02 am

Heated Bus Storage

NC-v4 EAc2:Optimize energy performance
posted by  Victoria Watson  on 

Hi, I am trying to work out the best way to model a heated (cold climate) bus storage facility in the baseline.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Aug 30, 2017, 3:25 am

Lease requirements for this credit

CS-2009 IEQc2:Increased ventilation
posted by  Troy Glasner  on 

Hi, I am just wondering what specific lease requirement language would be needed for this credit.

2
Tue Aug 29, 2017, 6:32 pm