Project pertaining to only the third floor of a building
CI-v4 EAc2:Optimize energy performanceposted by Peter Downar on
- The project pertains to a fit-up of only the 3rd floor of a multi-floor building.
Metering for Fuel Tank
NC-v4 EAp3:Building-level energy meteringposted by Carolyn Risley on
For EAp3 Building-level Energy Metering on a LEED v4 project, does a propane tank need a meter to meet the requirements of this prerequisite? Would monthly fuel delivery invoices be sufficien
Owner Supplied Furniture - non-residential
NC-v4 EQc4:Indoor air quality assessmentposted by Leanne Conrad on
We are approaching the start date of our IAQ assessment and I would like to be 100% sure that I need to include owner supplied furniture in the test.
Demolition of existing building
NC-v4 MRc5:Construction and demolition waste managementposted by Erik Heck on
We have a project which will be built on the site of an existing building. Does the demolition of that existing building need to be included in the MRc5 waste diversion calculations?
Has LEED provided any incentive for electrifying buildings in areas with clean electrical grids?
NC-v4.1 EAc2:Optimize Energy Performanceposted by Tim Nabholz on
Hi there,
Distinct Structures - Pump House
Schools-NC-v4 MPR2:Must use reasonable LEED boundariesposted by Kathryn Haeberle on
We are building a replacement elementary school on an existing school site. The school will get water from new wells we are installing that require a separate 'pump house'. This pump ho
Cultural smudging and ETS prereq
NC-v4 EQp2:Environmental tobacco smoke controlposted by Jason Burtwistle on
Hi all,
Standard reference for Canadian projects
Pilot-Credits SSpc55:Bird collision deterrenceposted by Josée Lupien on
Hello,
I would like to know if the new CSA A460:19 Bird-Friendly Building Design can be used for canadian project to acheive this pilot credit?