We are building a replacement elementary school on an existing school site.  The school will get water from new wells we are installing that require a separate 'pump house'.  This pump house will only be approx 53 square meters in area.  It will supply water to the school and in turn be fed it's power, gas and data from the school.  Can we exclude the pump house since it can't meet LEED on it's own (based on size/no occupants)? If we have to include it does that mean that the entire structure would also have to meet all the project LEED credits we are pursuing (e.g energy, materials, metering)? Thank you!