Forum quick links
Subway - same as light rail?
NC-v4 LTc5:Access to quality transitposted by Maria Porter on
Hi! Subway stations fall into the second category (800 m/0.5 miles from the project site) right?
2-year contract from what time?
NC-2009 EAc6:Green powerposted by Maria Porter on
I can find no evidence that the 2-year period needs to start as soon as the building is finished, is that the case?
Pilot credit wakable site
CS-v4 INc1:Innovationposted by Tobias Berge on
We chose to achieve a pilot credit called wakable sites. Unfortunately we discoverad that the credit is closed. We have register the project on LEED online but not registered this specific credit.
Energy model for a version 4 project in a version 2009 project
CS-2009 EAp2:Minimum energy performanceposted by Mathilda Jonsson on
Hi all! We started up a LEED for CS version 4 project and got really good results for the energy model.
Akvifer
NC-v4 EAc5:Renewable energy productionposted by Sara Johansson on
Hello, We have a project located in Sweden. Does an akvifer that stores heating and cooling count as renewable energy? The akvifer has two sides - a cold and a warm.
Renewable Energy
CI-v4 EAc4:Renewable energy productionposted by Maria Glädt on
See quotation from LEED-CI. "Use tenant renewable energy systems to offset the project’s energy cost.
Multi-attribute optimization
CS-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Tobias Berge on
Object - LEED v 4 Core & Shell. Sweden. Our goal is Platinum and we find the material credits very challenging.
Typical TSS measures from Sedum roofing
NC-2009 SSc6.2:Stormwater design - quality controlposted by Andreas Soederberg on
We are planning to have Sedum Roofing, partly to recieve credit 6.1. I have read a lot about vegetated roofing also to pursue credit 6.2.
Tricky project - NC, C&S or EBOM?
posted by Maria Glädt on
Hi We have a eight storey office building that will undergo a larger Core and Shell refurbishment; windows will be changed, the building is u-shaped and the "interior courtyard will be enclosed b