2-year contract from what time?
NC-2009 EAc6:Green powerposted by Maria Porter on
I can find no evidence that the 2-year period needs to start as soon as the building is finished, is that the case?
Managing rainwater in clay soil with low permeability
CS-v4 SSc4:Rainwater managementposted by Maria Glädt on
Hi, Our project site is a landfill area which was used as a parking during the construction of a tunnel located nearby. The site consists on very low permeable soil (mainly clay).
Use High Priority Site as Innovation
CS-v4 LTc3:High priority siteposted by Sara Johansson on
Hello, I have a CS v.2009 project and wish to use the High Priority v.4 credit as an innovation credit.
Pilot credit wakable site
CS-v4 INc1:Innovationposted by Tobias Berge on
We chose to achieve a pilot credit called wakable sites. Unfortunately we discoverad that the credit is closed. We have register the project on LEED online but not registered this specific credit.
Recommended values for Met and CLO and size of zones
NC-v4 EQc5:Thermal comfortposted by Sandra Holmström on
Hi! Is there any recommended value för Met and CLO that you must use when you perform your calculation of PMV/PPD etc? Is there any recommended size of the zones that require thermal comfort Cont
LEED v 4 deadline
posted by Tobias Berge on
We are planning to register a LEED v 4 Core & Shell project on LEED Online.
Plans & policies
Pilot-Credits IPpc88:LEED O+M Starter Kitposted by Pia Öhrling on
I Think to many Projects just follow the templates that are available since they know that is the easiest way to get the reviewers to approve. There should be more freedom when establishing policys
Dual Showerheads
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Pia Öhrling on
We have a hotel where the showers have two showerheads. One showerhead placed overhead and one han-held showerhead. They have different flow-data.
Showers?
CS-v4 LTc6:Bicycle facilitiesposted by Sara Johansson on
Do the required number showers have to be placed together (near the bicycle racks) or can showers spread through-out the building be accounted for?
Renewable Energy
CI-v4 EAc4:Renewable energy productionposted by Maria Glädt on
See quotation from LEED-CI. "Use tenant renewable energy systems to offset the project’s energy cost.