No Cooling Tower Sweden
Pilot-Credits WEpc94:No Cooling Towerposted by Louise Holmstedt on
We are pursuing this pilot credit as ACP for a Swedish Project. We Think it is fair that Projects without cooling Towers can achieve the no cooling Tower credit too.
Total Site Paving Area
NC-v4 SSc5:Heat island reductionposted by Maria Perzon on
I am not sure about the definition of "Total Site Paving Area". I have a already developed site with a building that is to be majorly rebuilt. Could I use the old site paving area as my reference?
GREEN POWER AND CARBON OFFSETS - 5 years contract
CI-v4 EAc6:Green power and carbon offsetsposted by Russell Fatkoulin on
Hi,
Reused element in either structure or enclosure
NC-v4.1 MRc1:Building Life-Cycle Impact Reductionposted by Maria Porter on
Option 2, path 4 – LCA. “….and incorporate reuse and/or salvage materials into the project’s structure and enclosure….”.
Walkscore only for a few countries?
NC-v4.1 LTc4:Surrounding Density and Diverse Usesposted by Maria Porter on
I investigated the new option 3 for this credit. The only information required is a screenshot of the Walkscore.
Wood decking on roof
CS-v4 SSc5:Heat island reductionposted by Maria Porter on
Has anybody had success in getting an SRI-value for wood (pine for example or other light wood that turns grey with age)? Saw a discussion about this in the v2009 forum that led to nothing.
Definition of ”Housing” in Diverse Uses
NC-v4 LTc4:Surrounding density and diverse usesposted by Maria Porter on
One use type is “Community anchor uses - Housing (100 or more dwelling units)”.
Glare control requirements for Nordic projects
NC-v4.1 EQc7:Daylightposted by Medina Deliahmedova on
Dear All,
I am an engineer at Inform Design (consulting practice based in Sweden), and we are working on a large office building project which aims to acquire LEED certificate.
Does the paring now have to be on-site?
CS-v4.1 LTc8:Electric Vehiclesposted by Maria Porter on
I have had many projects in v2009 that have had their parking in a neighboring garage if they don’t have their own garage. I have ongoing projects in v4 with the same situation.
Wind-PPA as renewable energy production?
NC-v4 EAc5:Renewable energy productionposted by Lai-San wong on
Hi! In the requirement for EAc5 (BD+C) it is stated: "The use of solar gardens or community renewable energy systems is allowed if both of the following requirements are met. 1)The project owns the