Forum quick links
LEEDv4 Homes and Multifamily Workbook, Water Reduction Calculato
Homes-v4 WEc1:Total water useposted by Raquel Clemente on
Hello! I am having some trouble to complete de Water Reduction Calculator. The Project is a whole building, being each floor a different dwelling unit.
Subtraction metering in C&S
CS-v4 EAc3:Advanced energy meteringposted by HoMU WELLTECH on
Good morning,
Kitchen faucet for restaurant project
CI-v4 WEc1:Indoor water use reductionposted by Borja Sánchez on
Hi, we want to certify a restaurant and as described in the reference guide: commercial kitchen (food service) sinks and prep sinks, including pot filling sinks, wash-down, and cleaning s
Multiply certification
posted by JORDI CASTELLANO on
Hello everyone,
My question is about the multiply certification.
Differences between design phase and construction phase
NC-v4 MPR3:Must comply with project size requirementsposted by JORDI CASTELLANO on
hello everyone,
our project has achieved the design phase of LEED review.
Lighting controls requirements
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Marina Curto on
Hi everyone,
I'm working on a School project in v2009 and I have some doubts whether the lighting controls design would meet credit requirements. I have two different cases:
Bike spaces usage
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Karyn Rodrigues on
Hello! I have a LEED NC project that is already operating and we are now finishing DR+CR submittals.
Split certification doubts
posted by Marina Curto on
Good morning,