Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Building Relocation

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Nativa Architecture  on 

If we decide to move a pavilion from Expo area to a new site, shall we take any "Building reuse" credits? All most of core and shell elements will be reused.

1
Sat Aug 26, 2017, 9:53 pm

return fan for PTAC

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

G3.1.2.8 states: "If return or relief fans are specified in the proposed design, the baseline building design shall be also be modeled with fans serving the same functions (...)".

1
Fri Aug 19, 2016, 4:46 pm

EA Credit 2

NC-2009 EAc2:On-Site Renewable Energy
posted by  Cristina Parenti  on 

Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..

1
Fri May 26, 2017, 2:53 pm

Baseline existing building envelopes

NC-2009 EAp2:Minimum Energy Performance
posted by  FABIO VIERO  on 

Hi, We are currently working on an existing building under major renovation, pursing a LEED certification following NC protocol v.2009.

1
Thu Jan 14, 2016, 3:35 pm

Minimum energy performance calculator

CS-2009 EAp2:Minimum Energy Performance
posted by  Giuseppina Amorusi  on 

Hi everybody I'm working on file "Minimum Energy Performance Calculator" for EAp2 (last version available in Resource on leedonline) which is unlocked. I need to fill in a new system or componen

1
Wed Dec 14, 2016, 3:20 pm

UNITS FOR SIMULTANEOUS&INDEPENDENT PRODUCTION OF HOT&COLD Water

CS-v4 EAp2:Minimum energy performance
posted by  Giuseppina Amorusi  on 

Hi all, I'm modeling an HVAC system in Design Builder + Energy Plus that consists in Air handling units and VRV system.

1
Fri Jun 30, 2017, 1:57 pm

n/a

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

G3.1.2.5 states: Ventilation.

1
Fri Jun 3, 2016, 2:49 pm

Demolished and rebuilt envelope

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

If the envelope is demolished and then rebuilt with the same shape does Table G3.1 part 5., baseline, point f apply?

1
Mon Apr 17, 2017, 2:25 pm

Towers as part of a single building

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

A building is composed by three towers that have the basement, the ground floor, and the first floor in common. The system for the baseline model shall be System 8.

1
Thu Mar 3, 2016, 3:33 pm

occupation hours for dormitories

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

I’m modelling a student house. In some rooms there is an independent kitchen, while in some other rooms there isn't.

1
Tue Aug 16, 2016, 4:35 pm