Building Relocation
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Nativa Architecture on
If we decide to move a pavilion from Expo area to a new site, shall we take any "Building reuse" credits? All most of core and shell elements will be reused.
return fan for PTAC
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
G3.1.2.8 states: "If return or relief fans are specified in the proposed design, the baseline building design shall be also be modeled with fans serving the same functions (...)".
EA Credit 2
NC-2009 EAc2:On-Site Renewable Energyposted by Cristina Parenti on
Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..
Baseline existing building envelopes
NC-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hi, We are currently working on an existing building under major renovation, pursing a LEED certification following NC protocol v.2009.
Minimum energy performance calculator
CS-2009 EAp2:Minimum Energy Performanceposted by Giuseppina Amorusi on
Hi everybody I'm working on file "Minimum Energy Performance Calculator" for EAp2 (last version available in Resource on leedonline) which is unlocked. I need to fill in a new system or componen
UNITS FOR SIMULTANEOUS&INDEPENDENT PRODUCTION OF HOT&COLD Water
CS-v4 EAp2:Minimum energy performanceposted by Giuseppina Amorusi on
Hi all, I'm modeling an HVAC system in Design Builder + Energy Plus that consists in Air handling units and VRV system.
n/a
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
G3.1.2.5 states: Ventilation.
Demolished and rebuilt envelope
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
If the envelope is demolished and then rebuilt with the same shape does Table G3.1 part 5., baseline, point f apply?
Towers as part of a single building
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
A building is composed by three towers that have the basement, the ground floor, and the first floor in common. The system for the baseline model shall be System 8.
occupation hours for dormitories
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I’m modelling a student house. In some rooms there is an independent kitchen, while in some other rooms there isn't.