The 90.1-2010 User's Manual states:
"In some cases, a complete HVAC system already exists (...) the proposed building and baseline building models are the same and are based on the existing HVAC system".
Is that statement valid also for the ventilation air flow rates (i.e., is exception c. of G3.1.2.6 not valid?)?