Campus project - District heating/cooling
NC-2009 EAp2:Minimum Energy Performanceposted by Nikos Tsitsikas on
Hi all,
PROJECTION FACTORS FOR VERTICAL FINS
CS-v4 EAp2:Minimum energy performanceposted by Fotis Kotsopoulos on
Dear all,
Is it possible to correlate vertical fins with projection factors shown in table 5.5.4.4.1 ASHRAE 90.1-2010?
FK
ASHRAE Baseline HVAC System
NC-v4 EAp2:Minimum energy performanceposted by Nikos Tsitsikas on
Hi all,
Can I pick someone's brain about which ASHRAE Baseline HVAC system we should be selecting for a Hospitality project we are working on?
ASHRAE Baseline HVAC System for Healthcare project
NC-v4 EAp2:Minimum energy performanceposted by Nikos Tsitsikas on
Hi all,
ASHRAE Baseline HVAC System for Hospitality project
Hospitality-NC-v4 EAp2:Minimum energy performanceposted by Nikos Tsitsikas on
Hi all,
Can I pick someone's brain about which ASHRAE Baseline HVAC system we should be selecting for a Hospitality project we are working on?
Terminal of Airport
posted by Konstantina Kalliakoudi on
Hello,
I have a project for the rating system LEED BD+C that is the Terminal of an airport.
I was wondering if USGBC had any special guidelines for airports.
Easily Achieved
Pilot-Credits MRpc69:Construction and demolition waste managementposted by Emmanuel Pauwels on
We applied this credit in our Project in Athens in Greece and had no difficulty achieving it.
online form SI units not functioning correctly
EBOM-2009 SSc6:Stormwater Quantity Controlposted by GEORGE GKLAVAS on
When using the same input data in both forms (IP and SI units) someone should expect the same result (percentage mitigated).
Policy goals
EBOM-2009 MRp1:Sustainable Purchasing Policyposted by Charalampos Giannikopoulos on
Does a specific goal need to be addressed for the policy or would a prescriptive description of the goal be used such as that “the goal is to, at a minimum, maintain the current environmentally pre
Airport Terminal LEED certification
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by KONSTANTINOS VAVALETSKOS on
In an airport LEED project, only the terminal building is going to be certified. In this case how the LEED Boundary should be defined?