Hi all,
We are working on a campus project that includes two separate buildings and a master site. Both buildings would be served by boilers and chillers that are located in the basement of one of those buildings.
How do we go about modeling the HVAC side of this project? Do we need to go with District heating and cooling networks? If so, are there any specific guidelines we need to be following or are we allowed to go with ASHRAE 90.1-2007 App. G?
Any thoughts would be much appreciated.
Thank you.
Kind regards,
Nikos
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.