Heat Island reduction provided by the building itsself
NC-v4 SSc5:Heat island reductionposted by Carmen Mielecke on
Dear All, if a Project consists of many small courtyyards and shade for those courtyyards is provided by the building structure itsself, Can this in any way be used to contribute to the fulfillment
smoking on private balconies
NC-v4 EQp2:Environmental tobacco smoke controlposted by Andreas Hintz on
We have an upcoming international new construction project of a multi-family residential building. Due to its numbers of stories LEED NC v4 is the most appropriate rating system to use.
Decentralized PM measuring devices permanent installation
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Sascha Krause on
Hello all,
Base building versus tenant metering
CS-v4 EAp3:Building-level energy meteringposted by Jens Apel on
Maybe I am overly cautious, but I would like to clarify the following.
LEED online Substitution v4.1 for v4 MRC1: Submit 4 Points for Option 4 Path 4?
NC-v4.1 MRc1:Building Life-Cycle Impact Reductionposted by J Schütz on
Dear all,
Indoor Air Measurements: required measurement duration
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Roland Braun on
Hi to all:
Option 2 - Strategy F: work surfaces comply but no movable partitions in the project
NC-v4 EQc6:Interior lightingposted by Benjamin Weise on
We are planning to comply with the strategies A, B, C and F. The strategies A, B and C should not pose a problem. However, I am not sure about strategy F:
Number of Lux Measurements in a High Rise Office Tower
CS-v4 EQc4:Daylightposted by Christine Recke on
In a Core and Shell project Office Tower that is over 50 stories, the rule is still measure all regularly occupied spaces in the building?
Entryway systems for delivery
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Christine Recke on
Hi everyone,
we have a project that includes a delivery entry, which is only used by the responsible service staff for the delivery operation.
LEED v4.1 Renewable Energy - no contracts with a period longer than two years available
NC-v4.1 EAc5:Renewable Energyposted by J Schütz on
Dear all,