Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

SUBMETERING FOR RETAIL SHOP

Retail-CI-v4 EAc3:Advanced energy metering
posted by  Toshif Ruikar  on 

Hi,

In my case, HVAC load is not more than 10%, still we need to provide submeters for HVAC ..?

1
Fri Jul 3, 2020, 4:39 pm

LEED CI V4 Energy Model, 2 Floors

CI-v4 EAp2:Minimum energy performance
posted by  SSN Energy Model  on 
Hi, I am doing the energy simulation for LEED CI v4 Rating.
14
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jun 24, 2020, 1:26 pm
3
Default Avatar
MECHANICAL ENGINEER
GE3S ENVIRONMENTAL CONSULTANTS
LEEDuser Basic Member
1 thumbs up
Tue Jun 23, 2020, 2:19 pm

THERMAL COMFORT TOOL

Retail-CI-v4 EQc5:Thermal comfort
posted by  Toshif Ruikar  on 

Hi,

CBE, Thermal comfort tool is not longer useful for LEED documentation, is there any other way to do provide thermal comfort documentation which is acceptable to LEED.

0

Drawings can be separately prepared and submitted?

CS-2009 SSc7.2:Heat Island Effect—Roof
posted by  Yuko Murata  on 

We are currently preparing the drawings to submit to USGBC.

3
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Fri Jun 19, 2020, 11:32 pm
3
Default Avatar
MECHANICAL ENGINEER
GE3S ENVIRONMENTAL CONSULTANTS
LEEDuser Basic Member
1 thumbs up
Tue Jun 16, 2020, 4:26 pm

Sisal 100% Natural Fiber Carpet

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Andrea Tirao  on 

Our project is a museum which targets IEQc4.3. One of the specified carpet for the project is 100% Sisal and we cannot find a manufacturer of Sisal with Green Label or Greenguard certification.

0

Can shared vehicles that do not have stops be considered public transport?

NC-v4 LTc5:Access to quality transit
posted by  Kavita Suresh  on 

Is there any guidance for passing shared vehicles (e.g. not stopping at the site) to be considered public transport?

0

Energy Star Target Finder Outside US?

CI-v4 EAp2:Minimum energy performance
posted by  Annabelle Cruz  on 

We are currently trying to get the certification for one of our projects here in Dubai, UAE which consists of a small office in a 5-storey building under LEED CI v4.

6
Tue Mar 24, 2020, 2:58 pm

Necessary to include Certified Wood if targeting Option 3 in MRc5

Healthcare-v2009 MRc5:Furniture and medical furnishings
posted by  Nasir Hussain  on 

Is it necessary to include certified wood in the calculation of MRc5 credit.

Can't we track only regional and recycled to achieve option 3 of this credit ?

0