Hi,

In my case, HVAC load is not more than 10%, still we need to provide submeters for HVAC ..?

The electrical designer has provided 2 DB(Distribution Board) for lighting and 3 DB for power, Do i need to provide the submetrs of all DBs/only to the DB which has a power rating of more than 10%. As, we are planning to provide the submeters at DB level.