Sea Water Cooled Chiller Modeling
NC-v4 EAp2:Minimum energy performanceposted by Sefa Sahin on
Dear All, Our project building is located in Istanbul/Turkey. Cooling will be provided by centralised two chillers. There is not a cooling tower.
International Project Epa CGP
NC-2009 SSp1:Construction Activity Pollution Preventionposted by ESRA OZKONUKSEVER on
Hi Y'all, we re working on a project in Turkey and creating an ESC and a SWPPP plan.
Reduced Parking Footprint Calculation
NC-v4 LTc7:Reduced parking footprintposted by Sefa Sahin on
The project building is gallery, museum. Museum category is not included in the Table - Base Ratios for parking spaces, by building type. What is the best option for calculation it?
Roof Water Feature
NC-v4 SSc5:Heat island reductionposted by Omer Moltay on
Dear All, My project is a museum building. The building roof is thick with water. So, project building roof have pool and observation terrace. Should it be counted as a reflective?
Multiple Metro Stations
posted by MERVE AYGENC on
Dear all! I need some help in deciding the registration type of multiple metro stations.
On-site CHP Modeling
NC-2009 EAp2:Minimum Energy Performanceposted by MURAT DOĞRU on
Dear all, We are modeling a hospital building which is served by two 800kW CHP systems. The CHP systems are dedicated to this building only, i.e.
Assembly U-value Calculation
NC-2009 EAp2:Minimum Energy Performanceposted by MURAT DOĞRU on
Dear all, I’d like to ask a question about the assembly U-value calculation according to NFRC norms.
Storage Room with a small window
NC-2009 IEQp1:Minimum IAQ Performanceposted by Orçun Özhelvaci on
Hi everyone, Although I read almost all the comments related with the ventilation requirements of the storage rooms, I could not find the exact answer for my question.
Data Center in on Office building Energy Modelling Calculations
NC-2009 EAc1:Optimize Energy Performanceposted by ESRA OZKONUKSEVER on
Hi all, We re currently working on an office building project of 10.000 square meters and within the building there is a data center as big as 150 square meters. we are plannig to apply v2009 NC.
Certification RQs for Incomplete Building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Orçun Özhelvaci on
Our university building undergoes it's construction stage.