Forum quick links
South-East Asia Alternative Compliance Path for ASHRAE 90.1-2010
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by dianti avo on
Hello,
Is there any Alternative Compliance Path for ASHRAE 90.1-2010 (mandatory provision) for South-East Asia region?
Thanks!
Energy Star Rated Power Value and Computation
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Gene Harn Lim on
We are computing the Energy Star Equipment table and struggle to source the equipment's rated power. A few questions:
3 buildings that connected via link-bridge
posted by Michael Wahjudi on
Hi all. Wanted to seek your comments on consideration of our developments as "single building" so it can fit into one LEED certification.
Residential and Commercial Density
Data-Centers-NC-v4 LTc4:Surrounding density and diverse usesposted by David Edenburn on
We have a project, a DC, that is in the middle of a large industrial park. There are no residential units within miles of the site.
Water Restoration Credits - Asia
Pilot-Credits WEpc110:Water Restoration Certificates®posted by Emily Tan on
I purchased water restoration certificates for an ID+C v4 project through BEF.
Data Centre energy model baseline
NC-v4 EAp2:Minimum energy performanceposted by Ameet AA on
Hello,
For a large data centre, I was thinking the baseline should be:
- HVAC: system 8
- CRAC fan power: Ls x 0.0021 + A as per ASHRAE table G3.1.2.9
Does low-emitting and fuel efficient vehicles parking count as preferred parking?
CI-v4 LTc5:Reduced parking footprintposted by Ameet AA on
Hi,
Our project has a few parking spaces reserved for low-emitting and fuel efficient vehicles, does it count as preferred parking? Thanks.
How to demonstrate the materials are reusable or recycable?
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Ameet AA on
The LEED language reads:
Which building type does data centre belong?
CI-v4 LTc5:Reduced parking footprintposted by Ameet AA on
There's no such a building type as data centre in the base ratio table, I was wondering if it should be "data processing, telemarketing", or "general light industrial, industrial park, and manufact