Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Use of greywater

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Noriko Nagazumi  on 

Hi all, We pursued Pilot Credit WEpc10 through Option 2, and planned to use recycled grey water for flush fixtures.This recycled grey water accounts for 100% reduction in flush water user from the

0

Material content of the product

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Akira Kataoka  on 

We'd like to know how important it is to state the respective materials and their respective weights in an EPD.

1
Wed Apr 19, 2017, 3:49 pm

Non-direct Purchase Item

EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumables
posted by  Ran Zhang  on 

The project I am working for does not pay for any toner cartridges as they are included in the maintenance contract.

0

Number of chillers in Energy Model

Data-Centers-NC-v4 EAc2:Optimize energy performance
posted by  Izumi Takayama  on 

Hi, I am currently preparing an energy model for a data center project (system 8).

1
Tue Nov 10, 2015, 3:03 pm

CCHP Modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  Jie Shen  on 

Consultant ERM Apr 20 2016 Guest CCHP System modeling Project Location: Japan My project is provided by CCHP system which owned by third party, the CCHP has two gas generators, one heat reco

1
Mon Apr 25, 2016, 7:28 pm

Low-Emitting Content Criteria for Wallcovering in EBOM v2009

EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additions
posted by  Noriko Nagazumi  on 

Do you have any idea for Low-Emitting Content (VOC) criteria of wallcovering like adhesives or sealants for LEED EBOM v2009 projects? Our project is an office building, and vinyl wallcoverings in s

1
Fri Aug 12, 2016, 6:34 pm

CCHP System modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  Jie Shen  on 

My project is provided by CCHP system which owned by third party, the CCHP has two gas generators, one heat recovered gas absorption chiller, two normal chillers and two boilers.

1
Tue Apr 15, 2025, 7:37 am

Railway station

ND-v2009 NPDc7:Transit facilities
posted by  Noriko Nagazumi  on 

Hi, Our project includes railway station within the LEED ND v2009 project boundary, but no bus stop.

1
Fri Aug 18, 2017, 3:30 pm

Confidential lease agreements cannot be obtained

CS-2009 IEQp1:Minimum IAQ Performance
posted by  John Mader  on 

Our project is an office building with some retail spaces on its lower floors that have already been leased.

0
1
Wed Jun 7, 2017, 6:32 pm