Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Interiors Life-Cycle Impact Reduction - Option 3 Design for Flexibility

CI-v4.1 MRc2:Interiors Life-Cycle Impact Reduction
posted by  Laura Riegle  on 

Hi, 

I am persuing the "Interiors Life-Cycle Impact Reduction" credit,  Option 3: Design for Flexibility for a CI project.

2
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Tue Sep 16, 2025, 2:09 pm

HERS index - does a special rater required?

Homes-v4 EAc1:Annual energy use
posted by  Chen Shalita  on 

Hello everyone, I'm exploring the possibility of certification of a lovely house to LEED for Homes. My question is: 1. is it compulsory to have the house audited by this RESNET thing? 2.

2
Thu Jun 1, 2023, 4:59 pm

Playground lighting

CS-v4 SSc6:Light pollution reduction
posted by  Chen Shalita  on 

Hello, in one of our projects, there is a playground lit by lighting fixtures around it.

1
Tue May 4, 2021, 1:43 pm
3
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Tue Nov 26, 2019, 1:22 am

MLO Non-Residential Lighting using the Performance Method

NC-v4 SSc6:Light pollution reduction
posted by  Candace Cohen  on 

The MLO says that in order to establish the Total Initial Site Lumens one must use Table D, adding together the Allowed Lumens Per Square Foot and the Allowed Base Lumens Per Site.

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Tue Jun 26, 2018, 9:23 am

Timeline issues with "Recycle or Reuse Construction and Demolition Waste"

ND-Plan-v4 GIBc16:Solid waste management
posted by  Ilan Yahav  on 

How can we proceed with this credit in a LEED ND-plan, if there is a requirement to track diverted waste?

1
Mon Jun 25, 2018, 3:59 pm

Previously developed and graded area by municipality - How long before construction?

NC-2009 SSc1:Site Selection
posted by  Ilan Yahav  on 

I am working on a Non-US project that is located in a new neighborhood that had been graded and developed by the local Municipality (roads and sidewalks) in 2006.

0

Post occupancy assesment

NC-v4 EQc4:Indoor air quality assessment
posted by  eran ben kennaz  on 

I was asked by the client to collect air samples now- a month after occupancy (he says he forgot to call me before.......). Would that be acceptable when they send in the reports?

3
Thu Mar 8, 2018, 2:29 pm

Minimum building energy performance

ND-Plan-v4 GIBp2:Minimum building energy performance
posted by  sam Alfassy  on 

based on the fact that we are on a planning stage only, what would be the documentation that approves compliance to this requirement.

1
Mon Jul 13, 2015, 3:23 pm