Forum quick links
WE Credit 4.2: Cooling Tower Water Management- non potable
EBOM-2009 WEc4:Cooling tower water managementposted by satheesh M on
The project’s cooling requirement is being met by both chiller plant inside the project boundary as well as the chiller plant in the Building Owned DES.
CREC purchase
CI-2009 EAc4:Green powerposted by Harpreet Rooprai on
I am doing a CI project, in which we are attempting credit EAc4 buying doing an Indian purchase of CREC's.
CI for Hospital;
CI-2009 SSc3.1:Alternative transportation - public transportation accessposted by Ajay Kumar on
This project has about 4 public bus stops located within 1/4 mile of walking distance from project entrance.
Number of CO2 Sensors
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by Subramaniam Chandrasekaran on
regarding the number of CO2 sensors, I have the following query; requesting for advice; do we have to install - 1. one CO2 sensor for every 1000 sqft 2.
MIXED MODE Ventilation
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Sathish Kumar on
May i know, what are the documents are providing clarity on designing the mixed mode ventilation strategies?
Amenities Within Main Building
posted by Aswin M on
We have a Retail Commercial Interior project inside a Main building.
LEED-GA as a student
posted by PRATIK KUMAR on
Hello everyone, Kindly help me out in providing a proper knowledge about LEED-GA exams as a student. As i am a working professional and doing my PG-Diploma in Urban planning as part time,and also i
VAV boxes
CS-2009 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
We request for a clarification regarding mandating the tenant to use the VAV boxes in core and shell projects. In a core and shell project, we will not know what system the tenant will be using.
EA Cr 1.5
Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelopeposted by balasubramaniam kg on
We have a retail commercial project in a leed certified building that is an air port. we want to know for the UA calculation only requires to use the project areas or all the building areas.
Purchasing- Ongoing
EBOM-v4 MRc1:Purchasing - ongoingposted by VISHESH AGARWAL on
what percentage of documentation should be required in local food material (100 miles).