Forum quick links
HVAC modelling for Tenant Occupied Spaces
CS-2009 EAp2:Minimum Energy Performanceposted by Saumendra Aggrawal on
I am working on a project, which is going for LEED C&S. The project has tenant occupied space, which has designed HVAC system for it.
Leeds case study
posted by Rudrabir Ghanti on
Dear All, I am currently studying Green buildings as a part of my curriculum at premier engg institute ,IIT-Delhi in india where I have been given an assignment to do an analysis of leeds certfica
WE Credit 4.2: Cooling Tower Water Management- non potable
EBOM-2009 WEc4:Cooling Tower Water Managementposted by satheesh M on
The project’s cooling requirement is being met by both chiller plant inside the project boundary as well as the chiller plant in the Building Owned DES.
CREC purchase
CI-2009 EAc4:Green Powerposted by Harpreet Rooprai on
I am doing a CI project, in which we are attempting credit EAc4 buying doing an Indian purchase of CREC's.
CI for Hospital;
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Ajay Kumar on
This project has about 4 public bus stops located within 1/4 mile of walking distance from project entrance.
Number of CO2 Sensors
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by Subramaniam Chandrasekaran on
regarding the number of CO2 sensors, I have the following query; requesting for advice; do we have to install - 1. one CO2 sensor for every 1000 sqft 2.
MIXED MODE Ventilation
CI-2009 IEQp1:Minimum IAQ Performanceposted by Sathish Kumar on
May i know, what are the documents are providing clarity on designing the mixed mode ventilation strategies?
Amenities Within Main Building
posted by Aswin M on
We have a Retail Commercial Interior project inside a Main building.
LEED-GA as a student
posted by PRATIK KUMAR on
Hello everyone, Kindly help me out in providing a proper knowledge about LEED-GA exams as a student. As i am a working professional and doing my PG-Diploma in Urban planning as part time,and also i
VAV boxes
CS-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
We request for a clarification regarding mandating the tenant to use the VAV boxes in core and shell projects. In a core and shell project, we will not know what system the tenant will be using.