one product both meet two criteria in option2.
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Renaud Gay on
Dear All, for option 2 calculation, I have a question on it. My project is a CI retail project. They will use carpet which include recycled content.
drainage area for sediment basin
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Hongyun Zhou on
when calculating the volume of sediment basin, what is the drainage area? Should I use footprint of the building or total land area of LEED boundary?
How to calculate the Tank size
NC-v4 SSc4:Rainwater managementposted by Patrick Y P Lui on
I am working a hotel project with 6090 sq.m greenery + 14210 sq.m pavement and willing to get 3 points by Percentile of rainfall events (Option 1) - Path 2 98th Percentile.
What's the size requirement for a Data Center Project with LEED v4 BC+D and O+M?
EBOM-v4 MPR3:Must comply with project size requirementsposted by Xiaoyu Cao on
Hi,
I see the minimum size requirements for BD+C and O+M is ,
"LEED BD+C and LEED O+M Rating Systems
Some questions about temporary parking spaces
NC-v4 LTc7:Reduced parking footprintposted by Jianzhushe Lili's on
Dear all:
Historic site
CS-v4 LTc3:High priority siteposted by Jie Xiong on
Hi I am new to V4. There is a question about this credit. On the RG, page 75 further explanation, says that "project may......indicates has significant historic or cultural value".
PAUs not serve the occupied areas
NC-2009 IEQp1:Minimum IAQ Performanceposted by study topenergy on
A data center is applying for LEED-NC v2009. There are 5 PAUs (Primary Air Unit). 4 of them will serve the equipment rooms. One will serve the equipement rooms and office areas.
Is this items means?
posted by shize zhang on
Is this item means onlly a building certified by ISO 50001 can apply for 1 credit in EA? Then how to apply for ACP? Thanks.
DCV requirement for high-occupancy areas
CS-2009 EAp2:Minimum Energy Performanceposted by Shenhao Li on
Hello! We have a canteen project in Shanghai. The building has three floors, total GFA is 64,067 square feet. The baseline HVAC system type is system 6.
Questions on ASE and sDA assessment area
NC-v4 EQc7:Daylightposted by Jackie Cheung on
Hello everyone. May I ask 2 questions on option 1 in EQ credit-Daylight? A) Assuming a project go for option 1 in EQ credit Daylight.