one product both meet two criteria in option2.

CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materials
posted by  Renaud Gay  on 

Dear All, for option 2 calculation, I have a question on it. My project is a CI retail project. They will use carpet which include recycled content.

8
Sun Apr 22, 2018, 7:09 pm

drainage area for sediment basin

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Hongyun Zhou  on 

when calculating the volume of sediment basin, what is the drainage area? Should I use footprint of the building or total land area of LEED boundary?

5
Mon Feb 12, 2018, 10:06 am

How to calculate the Tank size

NC-v4 SSc4:Rainwater management
posted by  Patrick Y P Lui  on 

I am working a hotel project with 6090 sq.m greenery + 14210 sq.m pavement and willing to get 3 points by Percentile of rainfall events (Option 1) - Path 2 98th Percentile.

0

What's the size requirement for a Data Center Project with LEED v4 BC+D and O+M?

EBOM-v4 MPR3:Must comply with project size requirements
posted by  Xiaoyu Cao  on 

Hi,

I see the minimum size requirements for BD+C and O+M is ,

"LEED BD+C and LEED O+M Rating Systems

1
Thu Nov 2, 2017, 4:12 pm
4
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Mon Oct 9, 2017, 10:19 am

Energy Star Related Product

Retail-CI-v2009 EAp2:Minimum energy performance
posted by  Wei Zeng  on 

Hello: I am working on a convenience store applying for LEED CI Retail 2009 certification, the project plans to design two outdoor air-cooled condensing unit which would be used as the cooling

1
Wed Oct 26, 2016, 9:58 pm

WEp1 and c1: Indoor Water Use Reduction

CI-v4 WEp1:Indoor water use reduction
posted by  BEE Incorporations  on 

Hi! We understand that all newly installed water fixtures must be WaterSense labeled.

1
Fri Apr 7, 2017, 2:23 pm

parking area under cover

CI-2009 SSc3.3:Alternative Transportation—Parking Availability
posted by  ANNA SUN  on 

my Project is in Shanghai China.I am preparing PI Form form my project. Now I have a question about parking area.

1
Fri Aug 5, 2016, 5:44 pm

Landscape Under Covered

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Anthea Ng  on 

Hello, My project has a open landscaped G/F partially covered by 2/F structure. Shade tolerant plant species shall be adopted at the covered areas.

1
Sat Aug 26, 2017, 9:47 pm

Data Center Energy Performance Calculator

NC-2009 EAp2:Minimum Energy Performance
posted by  Wei Jiang  on 

Dear all, We are trying to calculate the IT & electricial energy consumption of a data center, using the Minimum Energy Performance Data Center Calculator.

0