one product both meet two criteria in option2.
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Renaud Gay on
Dear All, for option 2 calculation, I have a question on it. My project is a CI retail project. They will use carpet which include recycled content.
drainage area for sediment basin
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Hongyun Zhou on
when calculating the volume of sediment basin, what is the drainage area? Should I use footprint of the building or total land area of LEED boundary?
How to calculate the Tank size
NC-v4 SSc4:Rainwater managementposted by Patrick Y P Lui on
I am working a hotel project with 6090 sq.m greenery + 14210 sq.m pavement and willing to get 3 points by Percentile of rainfall events (Option 1) - Path 2 98th Percentile.
What's the size requirement for a Data Center Project with LEED v4 BC+D and O+M?
EBOM-v4 MPR3:Must comply with project size requirementsposted by Xiaoyu Cao on
Hi,
I see the minimum size requirements for BD+C and O+M is ,
"LEED BD+C and LEED O+M Rating Systems
Some questions about temporary parking spaces
NC-v4 LTc7:Reduced parking footprintposted by Jianzhushe Lili's on
Dear all:
Documentation upload to LEED Online
CS-v4 EAc1:Enhanced commissioningposted by Erin Rowe on
We are just getting ready to submit LEED CI V4 commissioning documents, and I noticed that it only requests that we upload the table of contents for both the Final Cx Report and Ongoing Commissioni
Indoor air quality test methods
NC-v4 EQc4:Indoor air quality assessmentposted by Tyler Zhu on
From my understanding, in order to pass the test for PM2.5 and PM10, EPA Compendium Method IP-10 has to be used.
Participate in LEEDuser Pilot Credit Forum
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Henry Mak on
Hi everyone, I have a silly question. For the evidence of participating in LEEDuser Pilot Credit Forum, what document could show this action?
Faucet Flowrate at Actual Water Supply Pressure
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Ran Zhang on
Hi all, I have a question in regard to the flowrate of faucet, whether it should be based on the 60psi specified by LEED or local water supply pressure.
Some question about roof garden.
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Shenhao Li on
I have a hotel project in china. Our client will build a roof garden. Some areas of roof garden is vegetated roof, and other area will be construct as lane, tennis court or other things.