Forum quick links
Outdoor Air Delivery Monitoring - Installation of CO2 sensors
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by SAMY Chamy on
1. CO2 sensors are installed in our project, but not interconnected with fresh air fans. CO2 sensors will only monitor the CO2 levels and raise an alert when the levels are increased.
Water Efficiency Calculation
NC-2009 WEc3:Water Use Reductionposted by ABDUL MUTHALIB MOHAMED on
Hi, My project is a factory building. They are installing only Indian Water Closets and no Urinals. How to calculate water efficiency if Urinals are not used?
Bamboo Flooring to be considered in certified wood calculations
NC-2009 MRc7:Certified Woodposted by ABDUL MUTHALIB MOHAMED on
We have suggested bamboo flooring in a project for 2000 SFT. Should we include bamboo flooring in Certified wood calculations? Please clarify. Thanks in Advance.
Water Efficiency Calculation
NC-2009 WEc2:Innovative Wastewater Technologiesposted by ABDUL MUTHALIB MOHAMED on
Hi, My project is a factory building. They are installing only Indian Water Closets and no Urinals. How to calculate water efficiency if Urinals are not used?
Dormitory as support building
NC-2009 PIf2:Project Summary Detailsposted by ABDUL MUTHALIB MOHAMED on
We would like to register a factory building in Bangladesh. Th built up area of factory building is 2 lakh SFT, Ground level only.
LEED certification fees
posted by Nazli Hussain on
Can you please tell me about all compulsory certification fees to get LEED certification? Registration fees, split / combined design review fees , appeal fees - all are compulsory . Am i right ?
Venlilation Spaces Only
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All:- Our project have ventilation spaces only (No A/c spaces) so how we model these building in energy model As per LEED Missing manual we follow below things "Assign HVAC systems as per Ap
Fuel Rates for Non-traditional Fuel Sources
NC-2009 EAp2:Minimum Energy Performanceposted by Gopinath Vasu on
Hi All, I am working on a project where rice husk steam boiler is used for process. The fuel source (rice husk) is available at a free of cost for the project.
n/a
NC-2009 EAc1:Optimize Energy Performanceposted by SAMY Chamy on
Dear Marcus..... Greetings... In one of our project , we have CHP which fall under Case 1 as given in LEED Guide, CHP under Same Ownership..We have 2 nos of 500 KW Gas Generator which supplies
Energy modeling for LEED project (v3) requirement or not
posted by al-emran hossain on
We are going to start LEED project (Gold, points 66) in RMG factory at Bangladesh , if we will not consider in energy modeling for v3, that will accept or not , and required then which energy model