Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Campus approach in a gated residential compound or ND?

LEED Rating System Selection
posted by  ABDELHAMID BESHARA  on 

We have a gated Residential Compound consisting of around 60 buildings - 4 to 5 stories high - different models.

1
Mon Apr 11, 2016, 3:21 pm

Separating Pantry Zone

NC-2009 EAp2:Minimum Energy Performance
posted by  Omar Elrawy  on 

Dear all, I have a case where I need to know if I should model separate Pantry zone in Both Basecase and Proposed Case, or in Basecase only? I have an office building with one System 8

1
Wed Dec 3, 2014, 4:26 pm

Shipping Room

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Omar Elrawy  on 

Dear All, We have a shipping room in our office NC building. The room has 11 lockers, each locker has a chair for 1 occupant.

1
Wed Jan 6, 2016, 6:48 pm

Concerning Signatories

NC-2009 EAc3:Enhanced Commissioning
posted by  Omar Elrawy  on 

I need to know if the two signatories on the EA CREDIT 3: ENHANCED COMMISSIONING - LEEDOnline form are to be signed by the CxA, or by the owner?

1
Mon Jan 30, 2017, 10:55 pm

Concerning Underground Basements

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Omar Elrawy  on 

Dear all, My project is two underground basement parking floors, that are built on the total land area, while the above-grade floors are built on 30% of the total land area. Should I

1
Wed Nov 11, 2015, 8:56 pm

Report Contents

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Omar Elrawy  on 

Concerning Upload IEQp2-5, it is required to upload a differential air pressure test report for each designated smoking room.

0

Certificate timeline

ND-Plan-v4 GIBc1:Certified green buildings
posted by  soha yamani  on 

I am working on a neighborhood project in Egypt , and we have been thinking to use LEED v4 for ND Plan , it is stated on usgbc official website that Plan: certification is available to your neigh

1
Tue Mar 22, 2016, 3:08 pm

LEED EBOM Eligibility

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Amgad Khattab  on 

We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?

1
Tue Aug 25, 2015, 1:18 pm

ROCKY SOIL

NC-v4 SSc2:Site development - protect or restore habitat
posted by  soha yamani  on 

in case of rocky soil , limestone precisely in desert area , what kind of restoration should be done ?

1
Mon Aug 28, 2017, 6:37 pm

Deck to Deck Partition

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Omar Elrawy  on 

Dear all, I have a gypsum board partitions with a false ceiling all over the floor.

1
Tue Feb 24, 2015, 9:59 pm