Forum quick links
Building area to site area ratio
CS-2009 PIf2:Project Summary Detailsposted by Giuseppina Amorusi on
Hi, I am doing an office tower (19 stories above grade).
Standing human activity
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by VICTOR MORENO on
Hello, I am working in a Museum project.
residential/nonresidential
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Exception a. of G3.1.1 states: "Use additional system type(s) for non predominant conditions (i.e. residential/nonresidential …)".
Baseline Ventilation
CS-2009 EAp2:Minimum Energy Performanceposted by Toni Herena Montull on
Dear all, our previous version of the baseline model in a C&S building had the same ventilation rates than the proposed.
Reuse of existing building materials in the building parking lot
NC-v4 MRc1:Building life-cycle impact reductionposted by Greenlab on
Hi. In option 3 of this credit “Building and Material Reuse” we must reuse or salvage building materials from off site or on site as a percentage of the surface area.
No Facility Alterations
EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additionsposted by Charalampos Giannikopoulos on
Would a project with no facility alterations or additions during the performance period and as result with no relevant waste be still eligible for this credit?
pursuing thermal confort in a museum/gallery
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Angel Vega on
Our team is pursuing this credit for a museum/art galleries building. I´ve been checking the IAQ matrix and if I am strict, we should forget this credit.
Credit Complance/Justification in Spanish
posted by Peter Gibney on
For justifiying compliance with LEED credits for a Project in Spain, can supporting documentation, management plans, etc.
EPDM tile and Wood Porch
Schools-NC-v4 EQc2:Low emitting materialsposted by Emmanuel Pauwels on
We are looking for compliant materials for a School project. Regarding exterior applied products, it seems, that just "applied on site" must be compliant (Adhesives, sealants, coatings, roofing, a
Exterior lighting - Baseline Building
NC-2009 EAc1:Optimize Energy Performanceposted by VICTOR MORENO on
To simulate the exterior lighting in Baseline Building, i have to model it according table 9.4.5 of Standard 90.1? Or it is not possible to earn points for exterior lighting systems? Thanks in ad