Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Recycled cork can contribute to achieve MRc6?

NC-2009 MRc6:Rapidly renewable materials
posted by  Ricardo Sá  on 

We're working in a project that use a thermal coating based on cork material. This cork is 100% recycled. Can this material contribute to achieve both credits (MRc4 +MRc6)?

1
Fri Nov 27, 2015, 7:42 pm

tools

Pilot-Credits MRpc63:Whole building life cycle assessment
posted by  Emmanuel Pauwels  on 

Is one click LCA an accepted tool to demonstrate compliance with this credit?

0

Simulation software and Ashrae 90.1 version

CS-2009 EAc1:Optimize energy performance
posted by  Antonio Márquez  on 

Hi, we are certifying a new C&S building, in v2009. The version of Ashrae 90.1 to follow is 2007?

1
Thu Feb 12, 2015, 3:44 pm

LCA calculation

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Emmanuel Pauwels  on 

1- When performing a LCA calculation for the envelope and structure, not all materials proposed by the design team have an EPD.

1
Mon Mar 27, 2017, 1:21 pm

A single big space which include several functions.

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Michela Tedeschi  on 

Hi All, I'm now working on a project under LEED NC certification. The ground floor includes a conference room, offices, technical spaces, meeting rooms, and one big space, in which the following f

1
Mon Nov 2, 2015, 1:54 pm

.

NC-2009 EAp2:Minimum energy performance
posted by  Instra Ingenieros  on 

Wrong question. please delete this comment Sorry

0

Portfolio Energy Star

EBOM-2009 EAp2:Minimum energy efficiency performance
posted by  Mercè Llorca  on 

Hello. We will make the Eap2 by Energy Star. To do this we have invoices for the total consumption of the building (offices + CPD), and manual readings consumption of different meters.

1
Wed Feb 3, 2016, 4:20 pm

FTE - Healthcare buildings

Healthcare-v2009 PIf3:Occupant and Usage Data
posted by  VICTOR MORENO  on 

In our Healthcare project, there are workers during the morning, afternoon and evening, with a time of 8 hours each. if I count the FTE, I get a total of workers greater to the number of workstati

0

return fan for PTAC

NC-2009 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

G3.1.2.8 states: "If return or relief fans are specified in the proposed design, the baseline building design shall be also be modeled with fans serving the same functions (...)".

1
Fri Aug 19, 2016, 4:46 pm

Core and Shell for Residential project

LEED Rating System Selection
posted by  Emmanuel Pauwels  on 

A developer certifies a 10 story residential building using the LEED Core and Shell rating system.

1
Fri Nov 27, 2015, 9:09 pm