Exterior lighting - Baseline Building
NC-2009 EAc1:Optimize Energy Performanceposted by VICTOR MORENO on
To simulate the exterior lighting in Baseline Building, i have to model it according table 9.4.5 of Standard 90.1? Or it is not possible to earn points for exterior lighting systems? Thanks in ad
OCCUPANCY TO CALCULATOR
Warehouses-NC-v4 WEc2:Indoor water use reductionposted by Helena Garcia on
Dear Leed users, We are doing a warehouse project in Spain.
residential/nonresidential
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Exception a. of G3.1.1 states: "Use additional system type(s) for non predominant conditions (i.e. residential/nonresidential …)".
Baseline Ventilation
CS-2009 EAp2:Minimum Energy Performanceposted by Toni Herena Montull on
Dear all, our previous version of the baseline model in a C&S building had the same ventilation rates than the proposed.
Reuse of existing building materials in the building parking lot
NC-v4 MRc1:Building life-cycle impact reductionposted by Greenlab on
Hi. In option 3 of this credit “Building and Material Reuse” we must reuse or salvage building materials from off site or on site as a percentage of the surface area.
Indoor Water Use Reduction_Well water
CS-v4 WEc2:Indoor water use reductionposted by Giuseppina Amorusi on
Hi everybody, I was envolved in LEED v4 C&S certification. I would know if in Credit Indoor Water Use Reduction it’s possible to consider well water accumulated in water tank as alternative wat
Option 1: Zoning and controls
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Ricardo Sá on
Hi, The project is basically a huge sales area with some office spaces.The sales area is served by multiple compact rooftop units and the office areas are served by DOA´s for ventilation purposes
Alarms with CO2 sensors
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Instra Ingenieros on
hi, We have a project with non-densely spaces. The non-densely space will have CO2 sensor. VAV with 100% outdoor air will be supply the OA to these spaces.
Faucet in cleaning room
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by VICTOR MORENO on
Should I include the faucets placed in a cleaning room? It are used for cleaning of the building. Thanks
Aerothermal Energy
NC-v4 EAc5:Renewable energy productionposted by Helena Garcia on
We're designing a system based on renewable energy installation for new construction. A part of this installation would performed by aerotermal energy.