Forum quick links
Roof area exempt from the SSc7.2 calculation
NC-2009 SSc7.2:Heat Island Effect—Roofposted by FABIO VIERO on
We have a project with a terrace that is about 50% of the building roof.
UNITS FOR SIMULTANEOUS&INDEPENDENT PRODUCTION OF HOT&COLD Water
CS-v4 EAp2:Minimum energy performanceposted by Giuseppina Amorusi on
Hi all, I'm modeling an HVAC system in Design Builder + Energy Plus that consists in Air handling units and VRV system.
Negative value of Monthly Landscape water requirement?
NC-v4 WEp1:Outdoor water use reductionposted by Francesco Passerini on
Dear all, I am performing the calculation for the Water Outdoor Prerequisite, with both excel for a Project located in Italy (Rome): 1. Water budget tool (downloaded from EPA) 2.
Transfer Air for IEQp1 achievement
CI-2009 IEQp1:Minimum IAQ Performanceposted by Ricardo Sá on
Hello, I'm currently working on a project of a huge supermarket. The building has warehouses and storage rooms.
Multi-occupant Spaces Vs. Patients rooms
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by VICTOR MORENO on
Hi, I´m managed a Healthcare buildings. The reviewer advice me that workstation and share multi-occupant spaces must be reported consistently among IEQc6.1 and IEQc6.2 credits.
Multi-purpose unit for 4-pipe systems
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I'm considering a "Multi-purpose indoor unit for use in 4-pipe systems for the simultaneous production of chilled and hot water by means of two independent water circuits".
Group or single project?
posted by David Lazaro on
Hello, We are pursuing LEED EBOM v2009 for an office complex. The project was built at the same time and has two twin buildings, with independent HVAC systems.
Electric Resistance Heating
CS-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
What are the mandatory provisions for fan coils whose coils are heated through electrical resistances? I think par. 6.4.3.3.1 for the control. Something else?
APPA audits in Europe
EBOM-v4 EQp3:Green cleaning policyposted by Ana Villarroya on
I'm working on a green cleaning policy for a hospitality project.
Baseline heating set-point when no heating system exists
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
According to ASHRAE 90.1 (2007) Table G3.1 - 10 c, "where no heating systems exist, HVAC system shall be assumed to be electric".