Forum quick links
ICOP AHRI 340/360
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
As for the mandatory provisions according to ASHRAE 90.1-2007, Tab. 6.8.1A refers to ICOP with test procedure AHRI 340/360.
Group Approach
posted by Ricardo Sá on
Dear All,
Regarding LEED V4 – Group approach, I would like to clarify If may I use the group approach for the following:
Short term bicycle storage
NC-v4 LTc6:Bicycle facilitiesposted by Deerns Italia on
Hello everybody,
Group Approach - construction contract
posted by Ricardo Sá on
Dear All,
Regarding LEEd V4, using the group approach, what real means "group must be under the same construction contract"?
That means that the contractor must be the same?
Humidity control - "Unmet humidity load hours"
NC-2009 EAp2:Minimum Energy Performanceposted by Luis Andrade on
Hi all,
I've been reading some of the previous comments about the humidity controls (both humidification and dehumidification). Am I correct to assume:
Automatically controlled blinds modeling
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hi,
Building with similar floors and layout: simulation simplifications
NC-v4 EQc7:Daylightposted by Ricardo Sá on
Hi,
FSC x PFEC
NC-2009 MRc7:Certified Woodposted by Karyn Rodrigues on
I am working for a project in Barcelona which is pursuing LEEDv2009 certification.