Forum quick links
Solar panels serving another building
EBOM-2009 SSc7.2:Heat island effect - roofposted by Rasita Masalskyte on
If solar panels on our building‘s roof are serving another building‘s energy needs, can we still exclude these solar panels from calculations as mechanical equipment?
Open parking under the building
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by Rasita Masalskyte on
Dear all, We have a case where an open parking garage is located on the ground floor (under the building). Apparently, no exchaust system can be applied in this case.
IEQp1 - LEED CI 2009
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Aparna Maladkar on
Hi, I have completed an offline (active) IEQp1 form which shows that pre-requisites are being met. When I complete the same form online, the result is that the pre-requisites are not being met.
Which MRT to use
NC-2009 IEQc7.1:Thermal comfort - designposted by Jordan Kirrane on
Hi, I have the annual hourly mean radiant temperature results (from the energy model simulation). I'm wondering what MRT you have used in the past if you have all of these figures?
Retail Refrigeration
Retail-NC-v4 EAp4:Fundamental refrigerant managementposted by Jason Smith on
I am currently working on a new retail construction project and would like to know if we should include the chilled drink cabinets (fizzy drinks, Milk etc.) within the Fundamental Refrigeration Cal
Small entryways
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Sara Johansson on
Hello, What if a project has small retail stores on the bottom floor, less than 3m long, and the ground outside doesn't belong to the property owner but the municipality (and therefor not possible
Lighting Building Area method
CS-2009 EAp2:Minimum energy performanceposted by Pia Öhrling on
If the building is an office building with a small part retail and restaurant how should the areas be calculated for lighting when using the Building Area method?? The space usage types listed in P
Tricky project - NC, C&S or EBOM?
posted by Maria Glädt on
Hi We have a eight storey office building that will undergo a larger Core and Shell refurbishment; windows will be changed, the building is u-shaped and the "interior courtyard will be enclosed b
Suburban achieving SSc2
NC-2009 SSc5.2:Site development - maximize open spaceposted by Martin Meehan on
The credit language states that projects in Urban areas achieving SSc2 can contribute with green roof/pedestrian oriented hardscape. Are projects in Suburban areas achieving SSc2 allowed to do so?
Showers?
CS-v4 LTc6:Bicycle facilitiesposted by Sara Johansson on
Do the required number showers have to be placed together (near the bicycle racks) or can showers spread through-out the building be accounted for?