Forum quick links
Tenant work and submittal of credits
CS-2009 IEQp1:Minimum IAQ Performanceposted by Lise Dannesboe on
I am currently working on a Core & Shell project, which is a major renovation, aiming at LEED SILVER.
Overnight apartments
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Sara Johansson on
Hi! My Project has space types office, apartments (with residents) and overnight apartments (rented by the office tenant for office guests).
Separating waste - reuse at household
CI-2009 MRc2:Construction Waste Managementposted by Maria Glädt on
We have a project where there for example lighting fittings, some doors etc. that would be possible to reuse at other in other buildings.
Legal Wood- ID Point
Pilot-Credits MRpc102:Legal Woodposted by Emily Loquidis on
Is there potential to use this as an Innovation point in addition to the ACP Credit for MRc7? Has anyone been successful with this?
Outdoor air delivery monitor location?
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Mindaugas Mi on
Dear Leeduser.com members, who could explain where exactly should the outdoor air delivery monitor should be located? Only at the outdoor intakes?
Non-default shower use
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Susannah Goddard on
The USGBC raised the following query in our project design stage review: "It is not clear that the shower usage reported accurately reflects the usage patterns of the project.
EPDs used in CS project, can be accounted for in CI project?
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Sara Johansson on
If a CI project is located in a CS building and the tenant requires no fit out, can EPDs for products in the tenants space in the CS certification be used for the CI certification?
Prefinished wood flooring: alternative to emissions testing?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Sue Clark on
We are specifying an FSC-certified wood floor that has a white pigmented wax finish.
Pilot - option 1 - EPD
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Lise Dannesboe on
Hi.
Discrepancy between credit requirements and credit specifics
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Jody Lee Potvin-Jones on
I'm having a hard time understanding why it is necessary to document cost, weight and "percentage of product contributing to this criterion", if the requirements are simply to use 20 different pro