Option 2 IAQ Testing - Schedule

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Anne-Claire BARBERI  on 

Hello, In the reference guide, it is written that for "Option 2 Air Testing", the test must be conducted after construction ends and within 14 days following occupancy.

1
Fri Jun 24, 2016, 9:52 am

Cycle network, paths?

NC-v4 LTc6:Bicycle facilities
posted by  Karen Elliott  on 

Does anyone know if paths used for pedestrians and cyclist count as 'off Street' bicycle network. Thanks!

1
Thu Feb 25, 2016, 11:37 pm

Calculator Points clarification

Pilot-Credits MRpc102:Legal Wood
posted by  Patrice McVeigh  on 

Can you clarify the number of points available for this ACP? I believe it is 1 but if in the Validation Tap all statements for the point allocations are 'True' then the figure comes to 2.

0

Akvifer

NC-v4 EAc5:Renewable energy production
posted by  Sara Johansson  on 

Hello, We have a project located in Sweden. Does an akvifer that stores heating and cooling count as renewable energy? The akvifer has two sides - a cold and a warm.

1
Thu Nov 10, 2016, 4:51 pm

Option 2 Prescriptive Compliance EU labels for appliances

CI-v4 EAp2:Minimum energy performance
posted by  Karen Elliott  on 

I know others have asked this but I cannot find any definitive guidance on how to relate for example a dishwasher with an EU energy rating to the Energy Star label.

1
Tue Aug 1, 2017, 3:04 pm

Energy model for a version 4 project in a version 2009 project

CS-2009 EAp2:Minimum Energy Performance
posted by  Mathilda Jonsson  on 

Hi all! We started up a LEED for CS version 4 project and got really good results for the energy model.

1
Tue Jan 26, 2016, 3:51 pm

Primer Sealer VOC Content

CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Jordan Kirrane  on 

I have a water based primer sealer that the client is looking to use in order to fix artwork to the walls throughout their floors.

1
Wed Jan 18, 2017, 1:58 pm

CI in a CS project

CI-v4 LTc2:Surrounding density and diverse uses
posted by  Sara Johansson  on 

If a tenant chooses to certify ith CI in an already CS v.4 certified building (that has earned full points for Surrounding Density and DIverse Uses as well as Access to Quality Transit, Bicycle Fac

1
Fri Mar 31, 2017, 1:32 pm

Open parking under the building

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Rasita Masalskyte  on 

Dear all, We have a case where an open parking garage is located on the ground floor (under the building). Apparently, no exchaust system can be applied in this case.

1
Wed Aug 30, 2017, 5:02 pm

IEQp1 - LEED CI 2009

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Aparna Maladkar  on 

Hi, I have completed an offline (active) IEQp1 form which shows that pre-requisites are being met. When I complete the same form online, the result is that the pre-requisites are not being met.

1
Thu Dec 18, 2014, 3:14 pm