CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Maria Glädt on
Hi! Our project is a renovation project on a site with old concrete stones. Is it ok to document count with the SRI for new concrete? How shall it be documentet?
Cycle lane between project and Bicycle Network
NC-v4 LTc6:Bicycle facilitiesposted by Alicia Costas Freire on
Hello, My understanding from the LEED manual is that the credit does not require provision of a dedicated cycle lane between the building and the bicycle network and I was wondering if someone cou
FTE for campus or for building
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Karen Elliott on
We have a manufacturing campus and are assessing a new office block within that campus.
Alternative Walkability Features
Pilot-Credits PC14:Walkable Streetsposted by Emily Loquidis on
Has anyone successfully submitted alternative approaches other than the 9 factors listed within the credit requirements.
Transients, visitors and peak visitors
NC-v4 LTc6:Bicycle facilitiesposted by Sara Johansson on
The LEED manual states that transients = visitors. The credit requirements are percentages based on peak visitors. Appendix 2 in the manual gives defaults on transients (visitors).
Eurovent Certification
posted by Shane Geraghty on
Hi, I was wondering if anyone could direct me to information regarding AHU Eurovent certification requirements. Thank You
Help with LEED assessment from USGBC?
posted by Susannah Goddard on
I am undertaking a LEED assessment on a large project in the UK. We have undergone the Design Stage Review (both preliminary and final) and have some outstanding issues to be appealed.
Contaminated soil found during excavation.
CS-2009 SSc3:Brownfield Redevelopmentposted by Martin Meehan on
The project involved the demolition of a existing building that had asbestos present on it.
Rainwater Harvesting for Toilet Flushing
NC-v4 WEp2:Indoor water use reductionposted by Patrice McVeigh on
Hello all, Can rainwater harvesting be used to reduce the indoor water consumption percentage?
Process temperature controlled space
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Karen Elliott on
Hi I have a project where the temperature must be controlled automatically to ensure the manufactured product quality is maintained.