FTE for campus or for building

NC-2009 WEp1:Water use reduction
posted by  Karen Elliott  on 

We have a manufacturing campus and are assessing a new office block within that campus.

0

Alternative Walkability Features

Pilot-Credits PC14:Walkable Streets
posted by  Emily Loquidis   on 

Has anyone successfully submitted alternative approaches other than the 9 factors listed within the credit requirements.

1
Tue Nov 1, 2016, 8:50 pm

Reasonable Site Boundary

CS-2009 MPR3:Must use a reasonable site boundary
posted by  Mindaugas Mi  on 

Dear Leeduser.com members. I have a question regarding correct LEED boundary. 1.

0

Old concrete

CS-2009 SSc7.1:Heat island effect - nonroof
posted by  Maria Glädt  on 

Hi! Our project is a renovation project on a site with old concrete stones. Is it ok to document count with the SRI for new concrete? How shall it be documentet?

1
Wed May 20, 2015, 9:49 pm

Eurovent Certification

General forums
posted by  Shane Geraghty  on 

Hi, I was wondering if anyone could direct me to information regarding AHU Eurovent certification requirements. Thank You

0

Help with LEED assessment from USGBC?

General forums
posted by  Susannah Goddard  on 

I am undertaking a LEED assessment on a large project in the UK. We have undergone the Design Stage Review (both preliminary and final) and have some outstanding issues to be appealed.

1
Mon Nov 9, 2015, 4:48 pm

Contaminated soil found during excavation.

CS-2009 SSc3:Brownfield redevelopment
posted by  Martin Meehan  on 

The project involved the demolition of a existing building that had asbestos present on it.

1
Mon Feb 8, 2016, 5:28 pm

Rainwater Harvesting for Toilet Flushing

NC-v4 WEp2:Indoor water use reduction
posted by  Patrice McVeigh  on 

Hello all, Can rainwater harvesting be used to reduce the indoor water consumption percentage?

1
Thu Jun 2, 2016, 7:24 am

Transients, visitors and peak visitors

NC-v4 LTc6:Bicycle facilities
posted by  Sara Johansson  on 

The LEED manual states that transients = visitors. The credit requirements are percentages based on peak visitors. Appendix 2 in the manual gives defaults on transients (visitors).

1
Mon Nov 28, 2016, 7:48 pm

Toilets for customer use

Retail-CI-v4 WEc1:Indoor water use reduction
posted by  Karen Elliott  on 

We have a small retail unit with no toilet access for customers.

1