Forum quick links
Non Roof only
CS-v4 SSc5:Heat island reductionposted by Salam Salman on
We are targeting option 1: Roof and Nonroof for our project.
Managing rainwater in clay soil with low permeability
CS-v4 SSc4:Rainwater managementposted by Maria Glädt on
Hi, Our project site is a landfill area which was used as a parking during the construction of a tunnel located nearby. The site consists on very low permeable soil (mainly clay).
Distance between bicycle storage and bicycle network
NC-v4 LTc6:Bicycle facilitiesposted by Lise Dannesboe on
Hi.
"Design or locate the project such that a functional entry or bicycle storage is within a 200-yard (180-meter) walking distance or bicycling distance from a bicycle network"
Labelling of waste containers
NC-v4 MRp2:Construction and demolition waste management planningposted by Lise Dannesboe on
Hi.
Is inputting meters in the Whole Building model a MBCx requirement?
NC-v4 EAc1:Enhanced commissioningposted by Lise Dannesboe on
Hi.
Use of Whole Building model to predict the energy consumption for each meter
NC-v4 EAc3:Advanced energy meteringposted by Lise Dannesboe on
Hi.
Hope some can help.
Use High Priority Site as Innovation
CS-v4 LTc3:High priority siteposted by Sara Johansson on
Hello, I have a CS v.2009 project and wish to use the High Priority v.4 credit as an innovation credit.
Non-smoking signage requirement / location for LEEDv4 CI
CI-v4 EQp2:Environmental tobacco smoke controlposted by Meike Borchers on
Hi, we are looking at LEEDv4 CI for a project in London.
LAB21
EBOM-v4 EAp2:Minimum energy performanceposted by Ivan Blazevic on
Can a project (with adeqaute proportion of lab area) located in the United Kingdom benchmark its performance against Lab21 tool data?
Visitor parking only
CI-v4 LTc5:Reduced parking footprintposted by Karen Elliott on
We have an large office space in Central London that has 2 car parking spaces, but the staff will not be able to use them. They will only be used in exceptional circumstances for visitors.