Hi. Is it understood correctly that all energy, water and electrical meters (we have a lot more meters than even required by LEED) are not required to be entered into the Whole Building Simulation in order to compare the calculated with the actual measured for each meter?
Is it correct that this is not a requirement?
Marcus Sheffer
LEED Fellow7group / Energy Opportunities
LEEDuser Expert
5909 thumbs up
October 15, 2017 - 12:17 pm
Correct