Heat rejection

NC-v4 EAp2:Minimum energy performance
posted by  Hagen Bork  on 

Can you define what "heat rejection" is? I'm not exactly sure which energy counts towards "heat rejection".

 

1
Mon Jun 3, 2019, 8:48 pm

Pilot Credit 82: Local Food Production as Innovation Credit

EBOM-v4 INc1:Innovation
posted by  Nicole Isk  on 

We're trying to achieve an Innovation credit for our EBOM Project and considering submitting a Pilot credit 82:Local Food Production/WELL Crédit 51 Food Production as Innovation credit as there's a

1
Mon Jul 15, 2019, 10:50 pm

Limits for VOC content outside US, additional questions

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Ernst Schriefl  on 

All the limits on VOC content provided in the LEED reference guide (2009 edition) are minus water (g/L minus water or g/L less water).

0

Submitting a credit during the review process which was not submitted at first application

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Ernst Schriefl  on 

I have a general question regarding the review process:

Say, you have already submitted a certain amount of credits for review and received a preliminary review.

1
Wed Apr 17, 2019, 3:16 pm

Bicycle racks distance

CS-v4 LTc6:Bicycle facilities
posted by  Guillaume Rose  on 

Hi, 

In my Project, there are 2 bicycle areas : 

- 1 at the same level as the entrance but the distance is more than 30 meters

6
Wed Mar 27, 2019, 1:57 pm

Double skin facade

NC-v4 EAp2:Minimum energy performance
posted by  Sarah Leenknegt  on 

Hi

How do I model a naturally ventilated double skin facade in proposed and baseline building?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Mar 26, 2019, 7:21 am

Permanently installed drip irrigation system

CS-2009 WEc1:Water Efficient Landscaping
posted by  Andreas Hintz  on 

In accordance with the requirements of this credit, the project team has developed and will implement a water-efficient landscape stategy. The project is aiming for Option 2, No Potable Water

3
Default Avatar
Dipl.-Ing. Architekt, LEED AP (BD+C), BREEAM In-Use Auditor, DGNB Auditor
ikl GmbH
LEEDuser Basic Member
7 thumbs up
Fri Feb 22, 2019, 3:03 pm

Are Parking areas for Buses and Taxis included in Option 2

NC-v4 SSc5:Heat island reduction
posted by  Stephan Zweig  on 

Hello to all,

Do you  have any suggestion if I have to include for Option 2 of heat island  reduction credit the following:

1) Parking lots for Buses?

1
Wed Mar 13, 2019, 1:31 am

Sound transmission - STC Rating - Specify

NC-v4 EQc9:Acoustic performance
posted by  Stephan Zweig  on 

Hello Leed User community,

I am looking at the acoustic performance tool for LEED v4.

1
Fri May 8, 2020, 4:51 pm

Sewage treatment plant used as alternative water source

NC-v4 WEc2:Indoor water use reduction
posted by  Stephan Zweig  on 

Hello to all,

My building uses water for the toilets and for the irrigation from a municipally sewage treatment plan with biological treatment.

1
Mon Feb 18, 2019, 7:16 pm