Calculate U-value of exterior wall
NC-v4 EAp2:Minimum energy performanceposted by Michael on
Regarding the U-value of the exterior wall in the proposed model, I see the LEED calculator provided a hint "Proposed construction assembly U-factor should be as-designed and consistent with A
Is Rainwater Cistern acceptable as LID Techniques?
NC-v4.1 SSc4:Rainwater Managementposted by Michael on
Hi LEED experts, I read v4.1 "Further explanation", in the first section "Examples of Acceptable LID techniques", LEED mentioned rainwater cistern.
District Cooling Systems
NC-v4.1 EAp2:Minimum Energy Performanceposted by Mark Anthony Ver on
We are using the path for the EA Prerequisite 2 (Minimum Energy Performance),Performance Option 1-Streamlined Path) by modeling purchased cooling from an existing District Cooling Pl
Does LEED require a third-party to verify the LCA report?
NC-v4.1 MRc1:Building Life-Cycle Impact Reductionposted by Michael on
My project is using One Click software to do LCA report.
Two unidentical buildings from same owner/management for what approach?
EBOM-v4 MPR2:Must use reasonable LEED boundariesposted by Eric Bautista on
I would like to emphasize the general details of this project for LEED v4 or v4.1 O+M certification.
Modeling a warehouse that is divided into multiple typical units
CS-v4 EAc2:Optimize energy performanceposted by Michael on
My project is a big dry warehouse, which is divided into 7 typical units for future tenants. There is a small office with AC in each unit.
Baseline system selection for data center project above 1,50,000 sqft of area.
Data-Centers-NC-v4 EAc2:Optimize energy performanceposted by Rameez Lal on
I have came across a paper which says even if the white spaces(data halls) in a data centre building constitute the majority area of the project, the system selection for white spaces can be system
LEED 4.1 NC Energy and Atmosphere
NC-v4.1 EAc5:Renewable Energyposted by Britt Valdez on
Hi, related to LEED 4.1 NC Energy and Atmosphere requirements: When purchasing Renewable Energy Credits (RECs) and/or carbon offsets, there is a one-year term option and a fifteen-year term option.
Floor markings/signage on grass cells
NC-v4 LTc8:Green vehiclesposted by Zirjay Villanueva on
Carbon emission for Electrical Energy and Natural gas
NC-v4.1 EAc2:Optimize Energy Performanceposted by SAMY Chamy on
Dear Concern
Our project is located in Bangladesh and we are looking for carbon emissions per unit of electricity production and 1 m3 of natural gas usage.