Sun Dec 20, 2015, 12:55 pm

Problem with FSC and COC shipped from other country.

NC-2009 MRc7:Certified Wood
posted by  Somsak Jidmon  on 

We have the LEED NC 2009 project that under construction and we attempt to get the credit of MRc7 - Certified Wood. We had looked and found the product of FSC label from China that we could use.

6
Senior Architect and LEED Consultant
GA Studio Co.,LTD.
LEEDuser Premium Member
1 thumbs up
Wed Dec 16, 2015, 3:29 am

LEED CS building with very minimum landlord provision

CS-2009 EAp2:Minimum Energy Performance
posted by  Michael Wahjudi  on 

Hi all, I have LEED CS with very minimum client provision without AC systems (only emergency lights, emergency fans and lifts).

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Dec 15, 2015, 7:07 am

Doing monthly photo report of IAQ management

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Indochine Engineering VN  on 

Hi, My project is under construction, but just structural work (finalizing substructure and launching superstructure). It is long way to furnishing and MEP work onsite.

5
Mon Dec 14, 2015, 11:25 pm

G6.5.3.1 -2 Pressure Drop Adjustment by Space

Data-Centers-NC-v4 EAp2:Minimum energy performance
posted by  Rajesh Balachander  on 

Hi Marcus Would like to check. My space has FA system fan, Recirculating Air Fan and also Exhaust air fan. Can I use the table for adjustments.

3
Fri Dec 4, 2015, 7:52 pm

Parking Garage Demand Controlled Ventilation

CS-2009 EAp2:Minimum Energy Performance
posted by  Scott McMillan  on 

Hi there, When a proposed building model includes parking garage DCV based on CO - How should the control of the baseline model garage fan volume be controlled?.

3
Mon Nov 23, 2015, 2:56 pm

Open Air Lobby/Drop off

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  John Covello  on 

Hello, I am working on a project in SE Asia. As with many resorts in SE Asia the lobby is sheltered but open to the exterior of the building.

5
Tue Nov 17, 2015, 11:26 pm

Airconditioning for process requirement

NC-2009 EAp2:Minimum Energy Performance
posted by  Rathnashree Bharadwaj  on 

Hi, We are working on a tablet manufacturing facility which is fully air conditioned (Only cooling, no heating requirement).

3
Tue Nov 3, 2015, 2:21 pm

FSC Mix cabinet with Recycled content

NC-2009 MRc7:Certified Wood
posted by  Indochine Engineering VN  on 

Hi, one kitchen supplier showed me their CoC certificate that says the status of material is FSC Mix and they also confirmed their cabinet products have 25% recycled content.

4
Thu Oct 29, 2015, 8:27 pm

Biomass for process steam

NC-2009 EAp2:Minimum Energy Performance
posted by  Melissa Merryweather  on 

I am working on a factory that uses process steam, which accounts for about half of the whole energy use.

2
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Sat Oct 3, 2015, 3:42 pm