Idle energy rate for energy star equivalency calculations

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Shuchita Gupta  on 

Hi , We have an interior project specifying kitchen appliances like electric fryer , which are not energy star labelled so we are checking the equivalency for which we require idle rate and cook

2
Tue Jan 26, 2016, 1:09 pm

Method to Achieve Thermal - Comfort for Ventilated Area

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  SAMY Chamy  on 

Hai Everyone:- Our project is sewing factory It is not fully conditioned (A/C & Ventilation) 1.A/c for Office area 2.Fans (Exhaust, Fresh air, HVLS fans) for Production area We use HVLS fan

3
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Mon Jan 25, 2016, 3:44 pm

Construction Activity and Pollution Prevention

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  JP Rout  on 

We have Project intending to be registered under LEED 2009 BD+C for major renovations.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Jan 25, 2016, 9:13 am

Need Registration guidance for an upcoming Hospital campus

LEED Guidance for Campuses and Multiple Buildings
posted by  Neha Singhal  on 

We have a Medical institution coming up at Faridabad (India), which contains various types of building, where the construction would be carried out simultaneously for all the blocks.

3
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Sun Jan 17, 2016, 4:51 pm

Site Surrounding that Partially Developed

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Michael Wahjudi  on 

Our project is located at site that the surrounding site partially already developed and able to meet the development density requirement.

3
Wed Jan 13, 2016, 2:47 am

Use of Table fans in Working Desk

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  SAMY Chamy  on 

Dear all Our production area is sewing machines so we install table fan with switches in every sewing table.

3
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Fri Jan 8, 2016, 6:15 pm

Water Consumption Outside LEED Boundary

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Aswin M  on 

We have a garment factory project that has a Main block and two toilet blocks (separately for Men & Women).

8
Default Avatar
Conserve Consultants Private Limited
LEEDuser Basic Member
5 thumbs up
Mon Jan 4, 2016, 4:52 am

Single Building Certification_LEED New Construction 2009

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Aswin M  on 

We have a Garment factory project that has three blocks with connectivity bridge.  The three blocks are namely Cutting block, Sewing block, and Fabric store block.

7
Default Avatar
Conserve Consultants Private Limited
LEEDuser Basic Member
5 thumbs up
Wed Dec 30, 2015, 5:06 am

Major Renovation Building Energy Modelling

NC-2009 EAp2:Minimum Energy Performance
posted by  SAMY Chamy  on 

Dear All We are currently working on a Major Renovation Building.

3
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Tue Dec 22, 2015, 3:19 pm

Rating system: NC, CI or EBOM?

LEED Rating System Selection
posted by  Melissa Merryweather  on 

I seem to be posting on this thread constantly! I wish I had a straight-forward LEED project. My current concern is a single university building.

3
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Mon Dec 21, 2015, 10:32 am