NC-2009 IEQc7.1:Thermal comfort - designposted by Indochine Engineering VN on
My project has apartments and penthouses on the top. Engineers design VRF with thermostat and residents can control their comfort thermally.
LOW-EMITTING AND FUEL-EFFICIENT VEHICLES All fields
CS-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Magda Aghababyan on
Hi, We are doing core & shell project building structure has ground and 1st level retail shops,2nd to 9th parking 10th to 18th offices and 19th to 20th residential so,there are electrical charg
International Project - Case 2 Option 1 or Option 2
EBOM-2009 EAc1:Optimize energy efficiency performanceposted by Sheena Moses on
Dear all, The case 2 calculator has pointed us towards using Case 2 - Option 1 for our Existing Retail Mall project located outside of the US.
All water reduction through recycling
NC-2009 WEc3:Water use reductionposted by Melissa Merryweather on
I'm just curious if anyone has experience not even achieving the basic 20% reduction with the sanitary ware, but then achieving innovation points on both WEc2 and WEc3 (and of course the regional p
Nee of a fire suppression system
NC-2009 EAc4:Enhanced refrigerant managementposted by Magda Aghababyan on
Hi all, Currently we are working on a project which does not have a fire suppression system, but is trying to achieve "Enhanced refrigerant management" credit in LEED NC 2009. In the LEED online fo
Required parking lots and LEED boundary Calculations
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by kerry wang on
Hi all, We have a question about LEED boundary calculation as below: In order to save the land, our company has set up a shared parking lot in the area, so this project does not have new parking s
Project Registration
NC-v4 EAp2:Minimum energy performanceposted by Muzammal Abbas LEED AP (BD+C) on
Hi, We have project in Pakistan and we had done all measures for LEED certification, but due to some client personal reasons we were not able to register this project with USGBC and now after 1.5
Building Orientation
NC-v4 EAp2:Minimum energy performanceposted by Muzamil Rafique on
Hello Marcus, 1.My project orientation on NW,NE,SW and SE.
LEED CS 2009 - WEp1 & WEc3
CS-2009 WEp1:Water use reductionposted by Ruel Galve on
We are building a mixed use project, Office, Hotel and Residential to qualify for LEED CS 2009 Gold. Only the office core will have toilets that will be built during C & S construction.
Open Plan office served by 4 AHUs
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Michael Wahjudi on
Hi all, we received comments from reviewer that requesting the system computation should be separated for each system. Our development consists of few meeting rooms and open plan offices.