Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Ventilation design-worst case conditions

CI-2009 IEQp1:Minimum indoor air quality performance
posted by  S Nagarajan  on 

How to provide a narrative to explain how the worst-case condition was determined considering the total design airflow rate at the condition analyzed

1
Fri Nov 19, 2021, 6:15 pm

LEED certification fees

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Nazli Hussain  on 

Can you please tell me about all compulsory certification fees to get LEED certification? Registration fees, split / combined design review fees , appeal fees - all are compulsory . Am i right ?

1
Mon Aug 7, 2017, 4:02 pm

Reclaim land for more than 40 years

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Michael Wahjudi  on 

"All LEED projects must be constructed and operated on a permanent location on existing land" from these statement.

1
Wed Mar 16, 2016, 3:59 pm

All controls provided using customised mobile app

NC-2009 IEQc6.1:Controllability of systems - lighting
posted by  Yusuf Turab  on 

We are working on an IT office building that does not have any switches to control lighting.

1
Wed Jan 18, 2017, 1:02 am

Purchasing- Ongoing

EBOM-v4 MRc1:Purchasing - ongoing
posted by  VISHESH AGARWAL  on 

what percentage of documentation should be required in local food material (100 miles).

1
Wed Aug 31, 2016, 10:04 pm

Can a Retail CI Project achieve Water Cr if it has no Rest rooms

Retail-CI-v2009 WEc1:Water use reduction
posted by  Aswin M  on 

Can a Retail CI 2009 (restaurant) project achieve Water use reduction credit, if there is no Rest room in the (Retail CI) project scope.

1
Sat Aug 26, 2017, 11:50 pm

CI for Hospital;

CI-2009 SSc3.1:Alternative transportation - public transportation access
posted by  Ajay Kumar  on 

This project has about 4 public bus stops located within 1/4 mile of walking distance from project entrance.

1
Fri Nov 18, 2016, 4:35 pm

LEED Platinum

EBOM-2009 EAp1:Energy efficiency best management practices - planning, documentation and opportunity assessment
posted by  Muzammal Abbas LEED AP (BD+C)  on 

We had submitted one of our LEED EBOM V4 project final review and received 72 points. We had accepted the review and received Certified Gold Level.

1
Fri Feb 3, 2017, 10:08 am

Modeling pump, fan, COP

CS-2009 EAp2:Minimum energy performance
posted by  Indochine Engineering VN  on 

Hi, I have many chilled water pumps, 1 primary and 3 loop secondary pumps with heat exchangers.

1
Tue Oct 7, 2014, 1:20 pm
1
Wed Dec 17, 2014, 3:15 pm