Dear All:- Our project have ventilation spaces only (No A/c spaces) so how we model these building in energy model As per LEED Missing manual we follow below things "Assign HVAC systems as per Ap

1
Sun Apr 17, 2016, 9:59 pm

LEED-GA as a student

General forums
posted by  PRATIK KUMAR  on 

Hello everyone, Kindly help me out in providing a proper knowledge about LEED-GA exams as a student. As i am a working professional and doing my PG-Diploma in Urban planning as part time,and also i

1
Tue May 24, 2016, 1:13 pm

Purchasing RECs for Projects with District Cooling

CS-2009 EAc6:Green Power
posted by  Katherine Ann Resurreccion  on 

Hi, we have a LEED 2009 registered Core and Shell project in the Philippines which utilizes district cooling.

1
Fri Jul 28, 2017, 4:03 pm

Tile finishes for flat roof

CS-2009 SSc7.2:Heat Island Effect—Roof
posted by  Magda Aghababyan  on 

We are working project C&S the client need to use white colour ceramic tile on roof top.Should need to test it ? and value has to be more than 78 for the flat roof ?

1
Mon Aug 22, 2016, 5:48 am

Blind

CI-v4 EQc5:Thermal comfort
posted by  Ameet AA  on 

Hi, Can blind be considered as control for thermal comfort? Thanks.

1
Tue Jan 17, 2017, 7:41 pm

District Co generation Plantby

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  satheesh M  on 

Hi, The building is catered by own chiller plant located in the building & building owned DES Cogeneration plant for the space cooling.

1
Tue Nov 10, 2015, 11:50 pm

Storm water calculation

CS-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Magda Aghababyan  on 

Hi, We are working in project previously land was empty top soil is hard and when calculating Pre-development

1
Thu Jan 19, 2017, 5:50 pm

100% outdoor air indirec evaporative cooling system

NC-2009 EAp2:Minimum Energy Performance
posted by  BEE Incorporations  on 

Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.

1
Mon Dec 28, 2015, 4:08 pm

Fresh air supply using Cooling pad in Production area

NC-2009 IEQp1:Minimum IAQ Performance
posted by  SAMY Chamy  on 

Dear all Our project is single storied sewing factory in production area we have large size Exhaust fans in one side and opposite side of exhaust fan have cooling pad Now the issue is we can't p

1
Mon Mar 14, 2016, 1:11 pm

Project space Owned & Leased partly

CI-2009 MRc1.1:Tenant Space—Long-Term Commitment
posted by  Nandana Kumar  on 

Hi I have a project where out of the total project area, the owner owns 75% of the project spaces and remaining 25% is leased (lease period 3 years).

1
Sat Aug 26, 2017, 10:36 pm