LOCAL EQUAVALENT - WHERE EIA IS NOT COMMONLY DONE (INDIA)

Healthcare-v2009 SSp2:Environmental site assessment
posted by  jesmin joseph  on 

Dear Sir, We have registered a 200 bed Multispecialty hospital in India under LEED V2009 BD+C Healthcare rating system.

1
Thu Mar 9, 2017, 11:17 am

EA Prerequisite 2

CI-2009 EAp2:Minimum energy performance
posted by  Poorva Keskar  on 

In the Commercial Interiors project, the envelope and the base HVAC system is not in the scope of the interior project. HVAC for only a few cabins are in the scope.

1
Fri Feb 19, 2016, 4:10 pm

Project size extended in the middle of construction

NC-v4 MPR3:Must comply with project size requirements
posted by  wachira sosaeng  on 

My project registered for LEED 2009, mixed use building with 2 towers on the same podium.

1
Tue May 30, 2017, 5:12 pm

loading bay inside building footprint

NC-2009 PIf2:Project Summary Details
posted by  Melissa Merryweather  on 

Hi, I have a garment factory and the loading bay is actually inside the footprint of the building, taking up about 10% of the ground floor area.

0

Modeling DCV Savings for Proposed Building

CS-2009 IEQp1:Minimum indoor air quality performance
posted by  Bernard Sagaiyaraj  on 

To account savings using DCV, we understand that Baseline building ventilation is to be modeled using ASHRAE 62.1 whereas Proposed building ventilation is to modeled as designed. However our Basel

1
Fri Jan 27, 2017, 6:50 pm

Pharmaceutical Manufacturing factory project

Healthcare-v4 MPR1:Must be in a permanent location on existing land
posted by  Magda Aghababyan  on 

Hi, We are going to start a new LEED project for a pharmaceutical manufacturing facility building which will be started in a few months.

1
Sat Aug 26, 2017, 3:26 pm

VAV boxes

CS-2009 EAp2:Minimum energy performance
posted by  Rathnashree Bharadwaj  on 

We request for a clarification regarding mandating the tenant to use the VAV boxes in core and shell projects. In a core and shell project, we will not know what system the tenant will be using.

1
Thu Jan 8, 2015, 2:16 pm

BAS

EBOM-2009 EAc3.1:Performance measurement - building automation system
posted by  VISHESH AGARWAL  on 

Is it necessary to have exterior lighting monitor and control to achieve this credit point. if interior is on BMS, Will i able to take that credit.

1
Tue May 17, 2016, 12:27 pm

V3 project Minimum Indoor Air Quality Performance Pre-requisite.

CI-2009 IEQp1:Minimum indoor air quality performance
posted by  sajjad Malik  on 

I have submitted minimum indoor air quality performance pre-requisite for final design review and reviewer ask me for a narrative but I do not find any option for upload the narrative or any option

1
Thu Jul 20, 2017, 5:28 pm

Reclaim land for more than 40 years

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Michael Wahjudi  on 

"All LEED projects must be constructed and operated on a permanent location on existing land" from these statement.

1
Wed Mar 16, 2016, 3:59 pm