Option-3: Irrigation Meter Installed
EBOM-v4 WEc1:Outdoor water use reductionposted by VISHESH AGARWAL on
i am working on the project where project team use the STP Non potable water used for irrigation purpose. so i am reducing the 100% potable water. can i sufficient to achieve this credit.
Project located in a building with a very low fresh air rate
Retail-NC-v4 EQp1:Minimum indoor air quality performanceposted by Valentin Grimaud on
What if the project is located inside a 30-year old building with AHU supplying less than 10% fresh air rate? As we have to use the centralized ventilation system and we couldn't make any change t
Floor joists part of interior?
NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by John Covello on
Hello, Are floor joists considered part of the building interior? So artificial wood used in the joists cannot have urea formaldehyde?
Platinum Certification
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Muzammal Abbas LEED AP (BD+C) on
We had submitted one of our LEED EBOM project final review and received 72 points. We had accepted the review and received Certified Gold Level.
Site Management Policy but No Landscaping
EBOM-v4 SSp1:Site management policyposted by Nitesh Kumar J on
I'm looking for some guidance regarding Site management policy. There is no scope of landscaping or soil in the existing site, then how do we attempt this prerequisite.
Modeling OA with Demand control ventilation
CS-2009 EAp2:Minimum energy performanceposted by Indochine Engineering VN on
Hi, I have demand control ventilation for every AHU.
Is it too late to do SSp1?
NC-2009 SSp1:Construction activity pollution preventionposted by Indochine Engineering VN on
Hi, My project is a hotel and client just decided to do LEED when Construction of structure is almost done.
Proposed Case-Process Load
NC-v4 EAp2:Minimum energy performanceposted by Muzammal Abbas LEED AP (BD+C) on
Hi, Is there any limitations in LEED V4 regarding process energy that it should be minimum 25% (In proposed case) of the baseline energy cost for the building.
Dormitory as support building
NC-2009 PIf2:Project Summary Detailsposted by ABDUL MUTHALIB MOHAMED on
We would like to register a factory building in Bangladesh. Th built up area of factory building is 2 lakh SFT, Ground level only.
LIFT Lobbies to be included in VRP Calculations
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Preethi Ranjith on
i want some clarity on whether it is necessary to include Lift lobbies in VRP calculation to demonstrate compliance under IEQp1 and IEQc2? These lift lobbies are not regularly occupied.