Hi, I have demand control ventilation for every AHU. Is it true that OA baseline will modeled as minimum ASHRAE 62.1 and proposed will modeled as equipment schedule which is 30% above ASHRAE 62 (I pursue IEQc2 too) so OA in baseline and proposed is different.

Many Thanks for your feedback