Forum quick links
Prescriptive compliance
CI-v4 EAc2:Optimize energy performanceposted by Michael Wahjudi on
Can a project eligible for points under Base Building Systems - Building Envelope, Opaque and Building Envelope, Glazing if they can meet most of recommendations from 50% AEDG?
Epoxy mortar for anchoring rebar in concrete
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Anna Okviana on
Hai, my project use epoxy glue for anchoring rebar from brick wall to column and slab in indoor area. Does it must meet LEED requirement for adhesive and sealant?
Pick up and Drop Facility
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Priyadarsi Das on
We have a CI project which is basically a part of a factory development. The Admin Building is going for the LEED CI rating.
Thermal Comfort - ACP for Projects in India
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Gopinath Vasu on
Dear All, Kindly clarify the following query regarding Thermal Comfort Design Alternative Compliance Path for projects in India. In ACP it is said that projects shall meet the desired comfort con
Ongoing purchasing and waste policy
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by VISHESH AGARWAL on
Thanks in advance can any share the link of LEED V4 Ongoing purchasing and waste policy Tempelate.
Lighting control for Meeting room
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Thanh Le on
If a meeting room is designed with occupany sensor and manual override, does it comply with this credit. If it does not comply, how do we do to comply with this credit.
Compliance path for demonstrating minimum daily transit trip
CI-v4 LTc3:Access to quality transitposted by Dipti Talwar on
I am working on a project located in India.
Onsite solar PV generation - 10 years contract
EBOM-v4 EAc7:Renewable energy and carbon offsetsposted by Ameet AA on
Hi, Is it compulsory to sign a 10 years contract with the solar PV supplier (the PV panels are installed on the rooftop of the project building)?
Basic Doubts
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
I have a few basic Doubts regarding what is stated in the reference guide. Please clarify. 1.
Elevated buggy paths qand bridges for resort projecct
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by John Covello on
Hello, I am dealing with a hotel project that will have elevated buggy paths connected to buildings for a second and third tier of buildings.