Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Prescriptive compliance

CI-v4 EAc2:Optimize energy performance
posted by  Michael Wahjudi  on 

Can a project eligible for points under Base Building Systems - Building Envelope, Opaque and Building Envelope, Glazing if they can meet most of recommendations from 50% AEDG?

1
Wed Mar 16, 2016, 11:07 pm

Epoxy mortar for anchoring rebar in concrete

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Anna Okviana  on 

Hai, my project use epoxy glue for anchoring rebar from brick wall to column and slab in indoor area. Does it must meet LEED requirement for adhesive and sealant?

1
Sun Dec 9, 2018, 6:45 am

Pick up and Drop Facility

CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Access
posted by  Priyadarsi Das  on 

We have a CI project which is basically a part of a factory development. The Admin Building is going for the LEED CI rating.

0

Thermal Comfort - ACP for Projects in India

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Gopinath Vasu  on 

Dear All, Kindly clarify the following query regarding Thermal Comfort Design Alternative Compliance Path for projects in India. In ACP it is said that projects shall meet the desired comfort con

1
Thu Dec 22, 2016, 9:26 pm

Ongoing purchasing and waste policy

EBOM-v4 MRp1:Ongoing purchasing and waste policy
posted by  VISHESH AGARWAL  on 

Thanks in advance can any share the link of LEED V4 Ongoing purchasing and waste policy Tempelate.

1
Fri Oct 21, 2016, 10:29 pm

Lighting control for Meeting room

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Thanh Le  on 

If a meeting room is designed with occupany sensor and manual override, does it comply with this credit. If it does not comply, how do we do to comply with this credit.

1
Tue Jan 10, 2017, 8:15 pm
1
Sat Aug 26, 2017, 6:50 pm

Onsite solar PV generation - 10 years contract

EBOM-v4 EAc7:Renewable energy and carbon offsets
posted by  Ameet AA  on 

Hi, Is it compulsory to sign a 10 years contract with the solar PV supplier (the PV panels are installed on the rooftop of the project building)?

1
Tue Jun 27, 2017, 1:17 am

Basic Doubts

Data-Centers-NC-v4 EAp2:Minimum energy performance
posted by  Rathnashree Bharadwaj  on 

I have a few basic Doubts regarding what is stated in the reference guide. Please clarify. 1.

1
Tue Apr 19, 2016, 2:57 pm

Elevated buggy paths qand bridges for resort projecct

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  John Covello  on 

Hello, I am dealing with a hotel project that will have elevated buggy paths connected to buildings for a second and third tier of buildings.

1
Mon Jul 17, 2017, 9:10 am