SSc4.1
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Magda Aghababyan on
We have campus project from building entrance to the 1st bus stop near about 520m. Is it possible to apply this credit.
HVAC duct insulation adhesive
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Gaura Saxena on
Hi For a project using an adhesive for HVAC duct insulation, what should be the VOC limit that should be followed for since the standards does not mention any value directly for the insulation adhe
LPD for manufacturing space
NC-2009 EAp2:Minimum energy performanceposted by Panupant Phapant on
Hi everyone, The project is cosmetic and medicine manufacturing with office. My question is, What difference between detailed manufacturing and Low/High Bay in ASHRAE90.1-2007 table 9.6.1?
prescriptive efficiency requirements ABCPG section 2.9
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Rahul Yadav on
Hi We are doing a LEED CI project in India. The scope of the project includes only AHU , ducting and HRW from the HVAC side.
Area clarification
CS-2009 EAp2:Minimum energy performanceposted by Magda Aghababyan on
Hi, We have Core & Shell project while calculating the area of the locations, Pif and EAp2 have difference approximately 4% please let us know what is the maximum percentage deviation. Thank y
LOCAL EQUAVALENT - WHERE EIA IS NOT COMMONLY DONE (INDIA)
Healthcare-v2009 SSp2:Environmental site assessmentposted by jesmin joseph on
Dear Sir, We have registered a 200 bed Multispecialty hospital in India under LEED V2009 BD+C Healthcare rating system.
EA Prerequisite 2
CI-2009 EAp2:Minimum energy performanceposted by Poorva Keskar on
In the Commercial Interiors project, the envelope and the base HVAC system is not in the scope of the interior project. HVAC for only a few cabins are in the scope.
Project size extended in the middle of construction
NC-v4 MPR3:Must comply with project size requirementsposted by wachira sosaeng on
My project registered for LEED 2009, mixed use building with 2 towers on the same podium.
loading bay inside building footprint
NC-2009 PIf2:Project Summary Detailsposted by Melissa Merryweather on
Hi, I have a garment factory and the loading bay is actually inside the footprint of the building, taking up about 10% of the ground floor area.
Modeling DCV Savings for Proposed Building
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Bernard Sagaiyaraj on
To account savings using DCV, we understand that Baseline building ventilation is to be modeled using ASHRAE 62.1 whereas Proposed building ventilation is to modeled as designed. However our Basel