Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

SSc4.1

NC-2009 SSc4.1:Alternative transportation - public transportation access
posted by  Magda Aghababyan  on 

We have campus project from building entrance to the 1st bus stop near about 520m. Is it possible to apply this credit.

1
Wed Aug 17, 2016, 5:21 pm

HVAC duct insulation adhesive

NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Gaura Saxena  on 

Hi For a project using an adhesive for HVAC duct insulation, what should be the VOC limit that should be followed for since the standards does not mention any value directly for the insulation adhe

1
Tue Sep 1, 2015, 12:17 am

LPD for manufacturing space

NC-2009 EAp2:Minimum energy performance
posted by  Panupant Phapant  on 

Hi everyone, The project is cosmetic and medicine manufacturing with office. My question is, What difference between detailed manufacturing and Low/High Bay in ASHRAE90.1-2007 table 9.6.1?

1
Fri Sep 23, 2016, 2:49 pm

prescriptive efficiency requirements ABCPG section 2.9

CI-2009 EAc1.3:Optimize energy performance - HVAC
posted by  Rahul Yadav  on 

Hi We are doing a LEED CI project in India. The scope of the project includes only AHU , ducting and HRW from the HVAC side.

1
Mon Nov 2, 2015, 2:17 pm

Area clarification

CS-2009 EAp2:Minimum energy performance
posted by  Magda Aghababyan  on 

Hi, We have Core & Shell project while calculating the area of the locations, Pif and EAp2 have difference approximately 4% please let us know what is the maximum percentage deviation. Thank y

1
Thu Nov 24, 2016, 8:11 am

LOCAL EQUAVALENT - WHERE EIA IS NOT COMMONLY DONE (INDIA)

Healthcare-v2009 SSp2:Environmental site assessment
posted by  jesmin joseph  on 

Dear Sir, We have registered a 200 bed Multispecialty hospital in India under LEED V2009 BD+C Healthcare rating system.

1
Thu Mar 9, 2017, 11:17 am

EA Prerequisite 2

CI-2009 EAp2:Minimum energy performance
posted by  Poorva Keskar  on 

In the Commercial Interiors project, the envelope and the base HVAC system is not in the scope of the interior project. HVAC for only a few cabins are in the scope.

1
Fri Feb 19, 2016, 4:10 pm

Project size extended in the middle of construction

NC-v4 MPR3:Must comply with project size requirements
posted by  wachira sosaeng  on 

My project registered for LEED 2009, mixed use building with 2 towers on the same podium.

1
Tue May 30, 2017, 5:12 pm

loading bay inside building footprint

NC-2009 PIf2:Project Summary Details
posted by  Melissa Merryweather  on 

Hi, I have a garment factory and the loading bay is actually inside the footprint of the building, taking up about 10% of the ground floor area.

0

Modeling DCV Savings for Proposed Building

CS-2009 IEQp1:Minimum indoor air quality performance
posted by  Bernard Sagaiyaraj  on 

To account savings using DCV, we understand that Baseline building ventilation is to be modeled using ASHRAE 62.1 whereas Proposed building ventilation is to modeled as designed. However our Basel

1
Fri Jan 27, 2017, 6:50 pm