Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Changed awarded credit to attempted

LEED Rating System Selection
posted by  Prudhvi Mahadev  on 

I have mistakenly checked the credit box to "Attempted" for the credit which was alreadly awarded in LEED onlie portal. how to claim that the credit is already awarded in the final submission?

1
Sat Aug 26, 2017, 7:42 pm

CORE area and SHELL area

CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Yodi Danusastro  on 

How to specify the IEQc 4.1 credit area limit for CS in SHELL area? in case for tenant spaces (that is still unoccupied), or the anchor tenant that has construction in parallel.

1
Mon Mar 30, 2015, 1:17 am

Energy Modeling

NC-2009 EAp2:Minimum energy performance
posted by  Muzammal Abbas LEED AP (BD+C)  on 

Hi everyone, I am doing energy modeling for my project in Pakistan and i want to need some clarification and help from seniors: 1) Is it true that for baseline and proposed case HVAC system shoul

1
Wed Jun 29, 2016, 2:05 pm
1
Tue Dec 1, 2015, 12:08 am

Documents Required For pre-certification for LEED V4 Core Shell

CS-v4 MPR1:Must be in a permanent location on existing land
posted by  Aqrab Ali Rana  on 

I have project of apartment in Pakistan, What are documents required for all credits actually??Do I have to submit all documents as I submit for preliminary review or just to tell the strategies an

1
Fri Nov 4, 2016, 3:25 pm

ESVE Requirement

Pilot-Credits LTpc70:Green vehicles
posted by  Joshua Chia  on 

Hi, hope someone can help clarify whether the requirement for the ESVE to be capable of participating in a demand-response program or time-of-use pricing means that we must participate in either on

0

Building Flush out for naturally ventilated building

EBOM-2009 IEQc1.5:Indoor air quality best management practices - indoor air quality management for facility additions and alterations
posted by  PRATIK KUMAR  on 

Under EBOM IEQ-Cr-1.5, i have a building which is naturally ventilated, i am doing painting for the building, how do i meet the flush out procedure.

1
Wed Mar 16, 2016, 2:11 am

1.5 FAR for a residential project

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Katherine Ann Resurreccion  on 

Hi, The credit states that projects with 1.5 FAR will allow vegetated roof or roof gardens to be qualified in the area calculations.

1
Wed May 31, 2017, 2:49 pm

LE and FE Motorbike Parking

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Tim Middleton  on 

Our project is mixed use (retail, residential, hotel) and has parking for 894 cars and 3089 "2 wheeled vehicles" which will be a mix of bicycles, electric bikes and motorbikes but mostly motorbikes

0
1
Thu Jul 20, 2017, 9:49 pm