Project located in a building with a very low fresh air rate
Retail-NC-v4 EQp1:Minimum indoor air quality performanceposted by Valentin Grimaud on
What if the project is located inside a 30-year old building with AHU supplying less than 10% fresh air rate? As we have to use the centralized ventilation system and we couldn't make any change t
WE Credit 4.2: Cooling Tower Water Management- non potable
EBOM-2009 WEc4:Cooling Tower Water Managementposted by satheesh M on
The project’s cooling requirement is being met by both chiller plant inside the project boundary as well as the chiller plant in the Building Owned DES.
Amenities Within Main Building
posted by Aswin M on
We have a Retail Commercial Interior project inside a Main building.
Painting/coating in tenant space
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Indochine Engineering VN on
Hi, My project is a mixed use building with 2 floor on the top for apartments. building developer design interior fit out in all apartment for lease.
Duct sealing methods
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by John Covello on
Hello, Can alternative methods for duct sealing be used besides plastic wrap? One of our contractors is proposing using foam to seal the end of the duct openings.
Dormitory as support building
NC-2009 PIf2:Project Summary Detailsposted by ABDUL MUTHALIB MOHAMED on
We would like to register a factory building in Bangladesh. Th built up area of factory building is 2 lakh SFT, Ground level only.
LIFT Lobbies to be included in VRP Calculations
CI-2009 IEQp1:Minimum IAQ Performanceposted by Preethi Ranjith on
i want some clarity on whether it is necessary to include Lift lobbies in VRP calculation to demonstrate compliance under IEQp1 and IEQc2? These lift lobbies are not regularly occupied.
Double- Counting of Renewable Energy
CI-v4 EAc4:Renewable energy productionposted by Bharath Ravuru on
Hi, We are going with solar panels on site at our facility. Can I use the renewable energy generated for both on-site renewable energy production credit and also energy savings in the simulation?
Cleaning Chemicals
Hospitality-EBOM-v4 EQc7:Green cleaning - products and materialsposted by VISHESH AGARWAL on
Is laundary and kitchen cleaning chemicals included in LEED V4.
Meeting parking requirements for residential spaces
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Magda Aghababyan on
Dear Sir/ Madam, Our project (Hotel) is in a location where there are no defined local zoning requirements for parking.