Preferred Parking both inside and outside LEED boundary
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by sompoche sirichote on
Our project is factory expansion and our client purchase a new land nearby for parking facilities. The local zoning require 110 parking lot so we provide 104 parking lots on a new land outside LEED
Datacentre Requirements
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Priyadarsi Das on
Project Description: The project is approximately 3.0 lack Sft which is G+10 floors and going for LEED CI rating.
Outdoor Air Delivery Monitoring - Installation of CO2 sensors
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by SAMY Chamy on
1. CO2 sensors are installed in our project, but not interconnected with fresh air fans. CO2 sensors will only monitor the CO2 levels and raise an alert when the levels are increased.
Private shuttle buses
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Hanh Truong on
Dear all, I would like to use LI ID# 100001163 : "Shuttle buses should provide direct access to transit facilities within 2 miles of the project site, approximately a 5-10 minute drive, and must b
Zone adjust in residential project
CS-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
We have an apartment building project. In 1 dwelling unit has 1 bedroom 1 living unit and restroom. Do I need to separate between bedroom and living quarter ?
Location of OA monitor at PAU or AHUs
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Indochine Engineering VN on
Hi, my project has PAU distributes 100% OA to AHUs so I want to ask if installing 1 OA meter at PAU is sufficient for the credit or I have to install meters at every AHU? Thank you for your advic
International Project - Case 2 Option 1 or Option 2
EBOM-2009 EAc1:Optimize Energy Performanceposted by Sheena Moses on
Dear all, The case 2 calculator has pointed us towards using Case 2 - Option 1 for our Existing Retail Mall project located outside of the US.
All water reduction through recycling
NC-2009 WEc3:Water Use Reductionposted by Melissa Merryweather on
I'm just curious if anyone has experience not even achieving the basic 20% reduction with the sanitary ware, but then achieving innovation points on both WEc2 and WEc3 (and of course the regional p
Nee of a fire suppression system
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Magda Aghababyan on
Hi all, Currently we are working on a project which does not have a fire suppression system, but is trying to achieve "Enhanced refrigerant management" credit in LEED NC 2009. In the LEED online fo
Acoustic performance
Data-Centers-NC-v4 EQc9:Acoustic performanceposted by neeraj arora on
How to calculate composite STC for a room?