MIXED MODE Ventilation
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Sathish Kumar on
May i know, what are the documents are providing clarity on designing the mixed mode ventilation strategies?
Combine Natural ventilation & trickle ventilation for Apartment
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Thu Nguyen on
Dear all experts! I have a high-rise residential building which aim to comply with IEQ pre.1 by combining 2 ways. 1.
Water Efficiency Calculation
NC-2009 WEc3:Water use reductionposted by ABDUL MUTHALIB MOHAMED on
Hi, My project is a factory building. They are installing only Indian Water Closets and no Urinals. How to calculate water efficiency if Urinals are not used?
Historic District
NC-v4 LTc3:High priority siteposted by Indochine Engineering VN on
Hi, my project located in an old district where has a lot of old architecture buildings around with tourist.
Leeds case study
posted by Rudrabir Ghanti on
Dear All, I am currently studying Green buildings as a part of my curriculum at premier engg institute ,IIT-Delhi in india where I have been given an assignment to do an analysis of leeds certfica
Mixed-use Building
CS-2009 SSc9:Tenant design and construction guidelinesposted by Wan Ji Loo on
Hi, my project is a mix use building with two buildings connected via a commercial area below, a residential and hotel in one block and a office tower in the other.
Energy Submetering
EBOM-v4 EAc5:Advanced energy meteringposted by VISHESH AGARWAL on
I am working on EB Project in LEED V4. In V4 the advance sub-metering is required 1. Chilled water System: Chiller and Chilled water pumps 2.
Project located in a building with a very low fresh air rate
Retail-NC-v4 EQp1:Minimum indoor air quality performanceposted by Valentin Grimaud on
What if the project is located inside a 30-year old building with AHU supplying less than 10% fresh air rate? As we have to use the centralized ventilation system and we couldn't make any change t
WE Credit 4.2: Cooling Tower Water Management- non potable
EBOM-2009 WEc4:Cooling tower water managementposted by satheesh M on
The project’s cooling requirement is being met by both chiller plant inside the project boundary as well as the chiller plant in the Building Owned DES.
Amenities Within Main Building
posted by Aswin M on
We have a Retail Commercial Interior project inside a Main building.