MIXED MODE Ventilation

CI-2009 IEQp1:Minimum indoor air quality performance
posted by  Sathish Kumar  on 

May i know, what are the documents are providing clarity on designing the mixed mode ventilation strategies?

0

Combine Natural ventilation & trickle ventilation for Apartment

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Thu Nguyen  on 

Dear all experts! I have a high-rise residential building which aim to comply with IEQ pre.1 by combining 2 ways. 1.

1
Thu Mar 31, 2016, 1:25 pm

Water Efficiency Calculation

NC-2009 WEc3:Water use reduction
posted by  ABDUL MUTHALIB MOHAMED  on 

Hi, My project is a factory building. They are installing only Indian Water Closets and no Urinals. How to calculate water efficiency if Urinals are not used?

1
Mon Mar 2, 2015, 10:59 pm

Historic District

NC-v4 LTc3:High priority site
posted by  Indochine Engineering VN  on 

Hi, my project located in an old district where has a lot of old architecture buildings around with tourist.

1
Tue Jul 18, 2017, 5:14 pm

Leeds case study

General forums
posted by  Rudrabir Ghanti  on 

Dear All, I am currently studying Green buildings as a part of my curriculum at premier engg institute ,IIT-Delhi in india where I have been given an assignment to do an analysis of leeds certfica

0

Mixed-use Building

CS-2009 SSc9:Tenant design and construction guidelines
posted by  Wan Ji Loo  on 

Hi, my project is a mix use building with two buildings connected via a commercial area below, a residential and hotel in one block and a office tower in the other.

1
Mon Nov 30, 2015, 10:34 pm

Energy Submetering

EBOM-v4 EAc5:Advanced energy metering
posted by  VISHESH AGARWAL  on 

I am working on EB Project in LEED V4. In V4 the advance sub-metering is required 1. Chilled water System: Chiller and Chilled water pumps 2.

1
Wed Oct 5, 2016, 9:28 pm

Project located in a building with a very low fresh air rate

Retail-NC-v4 EQp1:Minimum indoor air quality performance
posted by  Valentin Grimaud  on 

What if the project is located inside a 30-year old building with AHU supplying less than 10% fresh air rate? As we have to use the centralized ventilation system and we couldn't make any change t

1
Tue Jan 17, 2017, 9:15 pm

WE Credit 4.2: Cooling Tower Water Management- non potable

EBOM-2009 WEc4:Cooling tower water management
posted by  satheesh M  on 

The project’s cooling requirement is being met by both chiller plant inside the project boundary as well as the chiller plant in the Building Owned DES.

1
Tue Dec 1, 2015, 4:07 pm

Amenities Within Main Building

Credit Forums
posted by  Aswin M  on 

We have a Retail Commercial Interior project inside a Main building.

1
Mon Jan 16, 2017, 12:23 am