Project boundary issues

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Muneeb Haider  on 

I am doing a project in Lahore, Pakistan for the British Council. It is a 6,000sf library located on a 50,000sf site.

0

Energy Modeling using "HAP"

NC-2009 EAp2:Minimum energy performance
posted by  Muzamil Rafique  on 

Hi Marcus Sheffer, i am totally confused please guide me.

1
Tue Jun 7, 2016, 1:35 pm

Building Flush Out Inquiry

EBOM-2009 IEQc1.5:Indoor air quality best management practices - indoor air quality management for facility additions and alterations
posted by  Sheena Moses  on 

We are currently working on an EBOM Retail project which is undergoing fit out works to the common mall and tenant areas.

1
Tue Aug 29, 2017, 4:01 pm

VRV Units Prescriptive Compliance in LEED CI 2009

CI-2009 EAp2:Minimum energy performance
posted by  Himanshu Dehra  on 

The project is installing VRV units of Daikin (VRV Model # RXYQ18PY16).

1
Wed Jun 17, 2015, 7:49 pm

SSc4.1

NC-2009 SSc4.1:Alternative transportation - public transportation access
posted by  Magda Aghababyan  on 

We have campus project from building entrance to the 1st bus stop near about 520m. Is it possible to apply this credit.

1
Wed Aug 17, 2016, 5:21 pm

HVAC duct insulation adhesive

NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Gaura Saxena  on 

Hi For a project using an adhesive for HVAC duct insulation, what should be the VOC limit that should be followed for since the standards does not mention any value directly for the insulation adhe

1
Tue Sep 1, 2015, 12:17 am

LPD for manufacturing space

NC-2009 EAp2:Minimum energy performance
posted by  Panupant Phapant  on 

Hi everyone, The project is cosmetic and medicine manufacturing with office. My question is, What difference between detailed manufacturing and Low/High Bay in ASHRAE90.1-2007 table 9.6.1?

1
Fri Sep 23, 2016, 2:49 pm

prescriptive efficiency requirements ABCPG section 2.9

CI-2009 EAc1.3:Optimize energy performance - HVAC
posted by  Rahul Yadav  on 

Hi We are doing a LEED CI project in India. The scope of the project includes only AHU , ducting and HRW from the HVAC side.

1
Mon Nov 2, 2015, 2:17 pm

EA Prerequisite 2

CI-2009 EAp2:Minimum energy performance
posted by  Poorva Keskar  on 

In the Commercial Interiors project, the envelope and the base HVAC system is not in the scope of the interior project. HVAC for only a few cabins are in the scope.

1
Fri Feb 19, 2016, 4:10 pm

Project size extended in the middle of construction

NC-v4 MPR3:Must comply with project size requirements
posted by  wachira sosaeng  on 

My project registered for LEED 2009, mixed use building with 2 towers on the same podium.

1
Tue May 30, 2017, 5:12 pm