Project boundary issues
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Muneeb Haider on
I am doing a project in Lahore, Pakistan for the British Council. It is a 6,000sf library located on a 50,000sf site.
Energy Modeling using "HAP"
NC-2009 EAp2:Minimum energy performanceposted by Muzamil Rafique on
Hi Marcus Sheffer, i am totally confused please guide me.
Building Flush Out Inquiry
EBOM-2009 IEQc1.5:Indoor air quality best management practices - indoor air quality management for facility additions and alterationsposted by Sheena Moses on
We are currently working on an EBOM Retail project which is undergoing fit out works to the common mall and tenant areas.
VRV Units Prescriptive Compliance in LEED CI 2009
CI-2009 EAp2:Minimum energy performanceposted by Himanshu Dehra on
The project is installing VRV units of Daikin (VRV Model # RXYQ18PY16).
SSc4.1
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Magda Aghababyan on
We have campus project from building entrance to the 1st bus stop near about 520m. Is it possible to apply this credit.
HVAC duct insulation adhesive
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Gaura Saxena on
Hi For a project using an adhesive for HVAC duct insulation, what should be the VOC limit that should be followed for since the standards does not mention any value directly for the insulation adhe
LPD for manufacturing space
NC-2009 EAp2:Minimum energy performanceposted by Panupant Phapant on
Hi everyone, The project is cosmetic and medicine manufacturing with office. My question is, What difference between detailed manufacturing and Low/High Bay in ASHRAE90.1-2007 table 9.6.1?
prescriptive efficiency requirements ABCPG section 2.9
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Rahul Yadav on
Hi We are doing a LEED CI project in India. The scope of the project includes only AHU , ducting and HRW from the HVAC side.
EA Prerequisite 2
CI-2009 EAp2:Minimum energy performanceposted by Poorva Keskar on
In the Commercial Interiors project, the envelope and the base HVAC system is not in the scope of the interior project. HVAC for only a few cabins are in the scope.
Project size extended in the middle of construction
NC-v4 MPR3:Must comply with project size requirementsposted by wachira sosaeng on
My project registered for LEED 2009, mixed use building with 2 towers on the same podium.