V4.1 Option2 (EV-ready infrastructure) parameters of providing raceways?
CS-v4 LTc8:Green vehiclesposted by Ronnel Flores on
Our project vies for this credit and chose to pursue Option 2 Electric Vehicle Charging Infrastructure.
CS requirements for office space
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Timothy Ian Middleton on
We have an office building project. Circulation, F&B and reception areas have high enough density that they will require CO2 sensors for this credit.
Smoking Policy
CS-v4 EQp2:Environmental tobacco smoke controlposted by Dean Barone on
Regarding the ETS Control Requirement for LEEDv4 that prohibits smoking inside the building and within the property line. Is it allowed to provide a certain area say 11th floor for smoking?
Prerequisites Vs. Credits
EBOM-v4 EAp1:Energy efficient best management practicesposted by Sajedeh Naghavi on
Hi, I am new to LEED system and in phase 1 of applying for "Certified Level" of an Existing Building (EB); The gap analysis.
Water discharge into Municipal STP
EBOM-v4.1 WEc1:Water Performanceposted by Kumar Biplab on
Background:- The building is part of a planned township and the township is maintained by municipality. Municipality also supplies potable water to the building through metered connection.
LEED v4-Credits MR-USGBC approved program
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Dipti Talwar on
Dear all, about MRc3 in LEED v4, could I have more information or links where can I find information especially about USGBC approved program? Thank you in advance!
Basic Amenities Within the Main Building
CI-2009 SSc2:Development Density and Community Connectivityposted by Aswin M on
We have a Retail Commercial Interior project inside a Main building. The Main building has many amenities such as restaurant,library, departmental stores, beauty salon, etc,.
Core and shell building’s energy
CS-v4 EAc5:Renewable energy productionposted by Devendra Chaughule on
Dear All,
We are doing a LEEDv4 CS project. For applying this credit, we need to engage 50%-100% (1-2 points) of total energy to be addressed by green power, REC and or offsets.
Water meter installation location
EBOM-v4 WEp1:Indoor water use reductionposted by Shathiswara Rao on
The potential way to target water reduction is by monitoring the water use for flushing. Is it necessary to install a water meter for each piping that goes to separate toilets?
Alternative requirements for buildings with high non-regulated loads
NC-v4 EAc5:Renewable energy productionposted by Tim Middleton on
We are working on a Manufacturing Project in Vietnam with very high non-regulated loads (around 75% of the total energy consumption).