Forum quick links
Use of Pavegen as permanent entryway system
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Kollsman Chan on
Hi LEED experts,
Spray adhesives has VOC Contents and GREENGURAD certificate also. This material can be use?
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Eunjoo Park on
My project located in South Korea. So I often fall into difficulties to interpretation manufacture data.
The material is "Scotch-WeldTM Hi-Strength Postforming 94 CA".
About Spray adhesives, Material has voc g/l limit and Greenguard certificate.
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Eunjoo Park on
My project is located in South Korea, so I open fall into difficulties to interpret manufacture data.
one product both meet two criteria in option2.
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Renaud Gay on
Dear All, for option 2 calculation, I have a question on it. My project is a CI retail project. They will use carpet which include recycled content.
What is the base building service water?
CI-v4 EAc3:Advanced energy meteringposted by JASON NIEN on
In the LEED CI V4 standard. Base building service water heating does not need to be metered.So someone can tell me what kind of use belongs to base building service water, thanks advance.
LEED ND v4 MPR2 project area
ND-v4 MPR2:Must use reasonable LEED boundariesposted by wenting ding on
Hi,
LEED ND v4 MPR2 project area
ND-v4 MPR2:Must use reasonable LEED boundariesposted by wenting ding on
We are considering applying for a LEED ND cergification.
Charging station being networked to encourage off-peak charging
NC-v4 LTc8:Green vehiclesposted by ERM Korea on
Hi. I would like to ask on the requirement of EVSE.
drainage area for sediment basin
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Hongyun Zhou on
when calculating the volume of sediment basin, what is the drainage area? Should I use footprint of the building or total land area of LEED boundary?
How to calculate the Tank size
NC-v4 SSc4:Rainwater managementposted by Patrick Y P Lui on
I am working a hotel project with 6090 sq.m greenery + 14210 sq.m pavement and willing to get 3 points by Percentile of rainfall events (Option 1) - Path 2 98th Percentile.