Forum quick links
Non-direct Purchase Item
EBOM-2009 MRc1:Sustainable purchasing - ongoing consumablesposted by Ran Zhang on
The project I am working for does not pay for any toner cartridges as they are included in the maintenance contract.
Leed v4 Core & Shell // Future fit-out by the owner
posted by Louis Haag on
Hi, We have a warehouse project for which the Core&Shell will be built in a first time, and the owner will perform the fit-out himself a few years later. The question is can we go for a LEED
Licensed Professional
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Tam Kin Hung on
To comply with the requirement of this prerequisite, data verification checklist and SEP should be submitted.
ESC plan for major renovation of data center
NC-v4 SSp1:Construction activity pollution preventionposted by sean wang on
We met a confused case. As it is a major renovation for data center, there is no need for controlling soil erosion, waterway sedimentation for construction.
200 rides per day required for shuttle buses?
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Weidong Luo on
Private shuttles are employed to satisfy SSc4.1 on our project.
EQ credit 6. Interior Lighting Question.
NC-v4 EQc6:Interior lightingposted by Jae Yong Park on
Hi all, I'm currently working on a research center which is located in South Korea. EQ credit 6. Interior Lighting Option 1.
Energy Star Related Product
Retail-CI-v2009 EAp2:Minimum energy performanceposted by Wei Zeng on
Hello: I am working on a convenience store applying for LEED CI Retail 2009 certification, the project plans to design two outdoor air-cooled condensing unit which would be used as the cooling
n/a
NC-v4 SSc2:Site development - protect or restore habitatposted by Biao Ma on
I want to know if vertical green wall with native and local plant species, whether or not can conribute the green ratio for option 1.
How to calculate Squatter Toilet in we p1? and roof garden?
NC-2009 WEp1:Water use reductionposted by Shenhao Li on
HI, i have 2 questions to ask: 1.Now i have a hotel project in china. In this project, Several squatter toilets(with water tank) are designed and will be constructed in the future.
PAUs not serve the occupied areas
NC-2009 IEQp1:Minimum indoor air quality performanceposted by study topenergy on
A data center is applying for LEED-NC v2009. There are 5 PAUs (Primary Air Unit). 4 of them will serve the equipment rooms. One will serve the equipement rooms and office areas.