DEC - EBOM

EBOM-2009 WEc4:Cooling tower water management
posted by  babu rajendran  on 

My project getting chilled water from District energy center which has cooling towers.

1
Wed Dec 10, 2014, 5:35 pm

Reduced Parking Footprint Calculation

NC-v4 LTc7:Reduced parking footprint
posted by  Sefa Sahin  on 

The project building is gallery, museum. Museum category is not included in the Table - Base Ratios for parking spaces, by building type. What is the best option for calculation it?

1
Thu Mar 30, 2017, 3:07 pm

LEED EBOM Eligibility

EBOM-2009 EAp2:Minimum energy efficiency performance
posted by  Amgad Khattab  on 

We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?

1
Tue Aug 25, 2015, 1:18 pm

Concerning Underground Basements

NC-2009 SSc6.1:Stormwater design - quantity control
posted by  Omar Elrawy  on 

Dear all, My project is two underground basement parking floors, that are built on the total land area, while the above-grade floors are built on 30% of the total land area. Should I

1
Wed Nov 11, 2015, 8:56 pm

Duct Seal level

NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Sarfaraj Khan  on 

Minimum duct seal level must comply with table 6.4.4.2A- Ashrae 90, i have this in my specification for duct and i think it apply only to G.I Duct, Not to pre insulated duct, please anyone can clar

0

Number of IAQ samples required ?

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Michael Boyle  on 

Our project consists of (5 townhouse + multipurpose room). This is considered as one building.

1
Wed Apr 13, 2016, 11:09 am

EAc1 points using DES Option 1 + A lot of Renewables

NC-2009 EAc1:Optimize energy performance
posted by  Reniel Barroso  on 

We have a project opting to get the maximum 19 credit points in EAc1.

1
Wed Aug 31, 2016, 3:45 pm

An example of a ducument for Prerequisite 2

ND-Plan-v4 SLLp2:Imperiled species and ecological communities
posted by  oko Yael  on 

Hello Eliot, We are in a process of preparing the prerequisites documents for the first LEED ND project in Israel. All other prerequisites are technically clear. Prerequisite 2 is somehow softer.

1
Tue Dec 13, 2016, 9:56 pm

Floor Coatings Compliance with IEQc4.3 in LEED 2009

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Mario S.  on 

We have a concrete floor, and we plan on putting a coating on top of the concrete finish.

1
Fri Feb 10, 2017, 7:05 pm

Shopping mall and Community Connectivity

General forums
posted by  Nadia Azzam  on 

My project is a mall that is planned to serve a district level; it definately includes at least 10 of the basic services listed in Appendix 1.

1
Thu Dec 4, 2014, 9:36 pm