Forum quick links
DEC - EBOM
EBOM-2009 WEc4:Cooling tower water managementposted by babu rajendran on
My project getting chilled water from District energy center which has cooling towers.
Reduced Parking Footprint Calculation
NC-v4 LTc7:Reduced parking footprintposted by Sefa Sahin on
The project building is gallery, museum. Museum category is not included in the Table - Base Ratios for parking spaces, by building type. What is the best option for calculation it?
LEED EBOM Eligibility
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Amgad Khattab on
We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?
Concerning Underground Basements
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Omar Elrawy on
Dear all, My project is two underground basement parking floors, that are built on the total land area, while the above-grade floors are built on 30% of the total land area. Should I
Duct Seal level
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Sarfaraj Khan on
Minimum duct seal level must comply with table 6.4.4.2A- Ashrae 90, i have this in my specification for duct and i think it apply only to G.I Duct, Not to pre insulated duct, please anyone can clar
Number of IAQ samples required ?
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Michael Boyle on
Our project consists of (5 townhouse + multipurpose room). This is considered as one building.
EAc1 points using DES Option 1 + A lot of Renewables
NC-2009 EAc1:Optimize energy performanceposted by Reniel Barroso on
We have a project opting to get the maximum 19 credit points in EAc1.
An example of a ducument for Prerequisite 2
ND-Plan-v4 SLLp2:Imperiled species and ecological communitiesposted by oko Yael on
Hello Eliot, We are in a process of preparing the prerequisites documents for the first LEED ND project in Israel. All other prerequisites are technically clear. Prerequisite 2 is somehow softer.
Floor Coatings Compliance with IEQc4.3 in LEED 2009
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Mario S. on
We have a concrete floor, and we plan on putting a coating on top of the concrete finish.
Shopping mall and Community Connectivity
posted by Nadia Azzam on
My project is a mall that is planned to serve a district level; it definately includes at least 10 of the basic services listed in Appendix 1.