Forum quick links
Correctional Facility lighting
NC-v4 SSc6:Light pollution reductionposted by Lawrence Rennell on
Government mandated roadway lighting is exempted from light pollution reduction calculations. What about correctional facilities?
Commercial refrigeration systems but not a store
EBOM-v4.1 EAc1:Enhanced Refrigerant Managementposted by Summer Minchew on
I have an O+M project considering Option 2.
CRI Green Label Plus-Low Emitting Materials
posted by Bob Paterson on
Looking to confirm if CRI Green Label Plus remains as eligibility for a point in Low emitting materials strategy for V4.1?
School- Combination Oven (p2 et credit)
Schools-NC-v4 WEp2:Indoor water use reductionposted by Priscillia Champagne on
Hi LeedUser, My supplier specialist asked me 2 questions on Combination Oven :
Open spaces - Turf Grass Calculation
Schools-NC-v4 SSc3:Open spaceposted by Michael J Turner on
Hi There,
Is Turf grass included in the calculations as vegetated open space? We have a school project. It is LEED V4.0 and we are going with V4.1 for this credit.
furniture reused
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Priscillia Champagne on
Hi, for a new school project, the client wants to recuperate a large part of his furniture not integrated to the building to reuse it (like desk). For the raw material supply credit, it is sp
Metal stops for Tiles
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Cecile de Villemeur on
Hello,
Do you think that metallic stops for tiles should be assessed as flooring systems for IEWc4.3 credit ? THanks !
Emergency generator building
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Priscillia Champagne on
I am starting a project in which we are building a new addition to an existing hospital which will be approx. 30 000 m2 (considered separate building from existing hospital).
New addition with separate air distribution systems also feeding renovation portion of existing hospital
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Priscillia Champagne on
We are planning to register a new project for LEED certification, but we need to make sure that we can comply with the minimum program requirement #2 beforehand.